L-K Industries Benchmark C Скачать руководство пользователя страница 13

www.lk-ind.com & 713-926-2623

Page. 13

Troubleshooting

Common Issues

Issues that may occur during centrifuge operation include excessive vibration, broken tubes, broken 

or malfunctioning LCD screens, cushions stuck in shields, etc. For issues that cannot be identified 

and resolved by the user, more technical troubleshooting details can be found on the L-K Industries 
website. Alternatively, contact the L-K Industries Tech Helpline for assistance.

Motor

If the motor does not run when the “PUSH TO RUN” button is pushed, make sure there is power to 

the motor (green indicator light on). If the light is off, press the “MOTOR POWER ON” button. Ensure 

that the sliding door is completely closed. The door locking mechanism consists of a proximity switch 

that uses a sensor to determine whether the door is closed. When the door is closed, the switch 
closes a circuit feeding power to the motor. Also, check to make sure the “EMERGENCY MOTOR OFF 
SWITCH” is not pushed in.

If the motor stalls or does not come up to speed properly or the heaters do not turn on, check the 
fuses inside the front panel. Contact the L-K Industries Tech Helpline if assistance is needed in 
checking or changing fuses. 

If using the Countdown Timer during operation, make sure there is time remaining. Once the timer 
runs out, the motor will automatically shut down. If the timer is not being used (i.e. for tests longer 
than the typical preset time), turn the timer to the “OFF” position.

When the motor controller is functioning properly, the green indicator light will be lit. If the green 
light does not turn on when the “MOTOR POWER ON” button is pressed, there are several 

possibilities for the error. Use a screwdriver to open the front panel of the unit and view fault codes 
on the LCD screen of the motor controller Contact the L-K Industries Tech Helpline for help 
troubleshooting fault codes.

Heaters & Temperature Controller

If 

the temperature displayed on the temperature controller has dropped significantly, the 

temperature inside the bowl may have reached high enough temperature to open the manual 
reset mechanical thermal switch on top of the lid. This will disconnect power to the heaters. Check 

the switch on top of the lid to see if it has been tripped. Ensure that the button on the switch snaps 

back into place.

If the manual thermal switch has not been tripped, contact the L-K Industries Tech Helpline for 
assistance.

Lid and Door Assembly

The following are possible sources of failure of the lid and door locking mechanism:

•  Sliding Door – Add grease for smoother opening and closing.

•  Proximity Switch & Sensor – These work together to detect door position and allow power to the

motor; failure of either prevents the motor from running.

•  Magnet – This is mounted inside the sliding door and aligns with the sensor when the door is

closed; can become detached.

•  Solenoid & Locking Pin – These work together to lock the door during motor operation; locking pin

may be misaligned with the door.

Contact the L-K Industries Tech Helpline to troubleshoot problems with the lid and door assembly.

Содержание Benchmark C

Страница 1: ...MANUFACTURING QUALITY and customer service in the PETROLEUM TESTING industry BENCHMARK C MANUAL Heated Laboratory Centrifuge Demand a higher standard L K INDUSTRIES Petroleum Testing Equipment Supplie...

Страница 2: ...Our original Melton centrifuge set the standard in 1957 and continues to inspire our product development today We look forward to continuing the rich traditions that have made us successful and to ma...

Страница 3: ...stribution Partner the warranty lasts one year from the in service date During the one year warranty period L K Industries shall repair or replace defective equipment free of charge L K Industries sha...

Страница 4: ...s Installation Electrical Connection 9 9 10 10 11 11 Loading and Powering On Heated Operation Timer Operation Motor Operation MAINTENANCE 12 12 12 Replacement Parts Repair Services Housekeeping Replac...

Страница 5: ...r the test Both the timer and the temperature controller settings are adjustable This centrifuge is designed to optimize operator safety and includes an automatic locking door Carefully following safe...

Страница 6: ...nt in Lubricating Oils ASTM D2709 Standard Test Method for Water and Sediment in Middle Distillate Fuels by Centrifuge ASTM D893 Standard Test Method for Insolubles in Used Lubricating Oils Applicable...

Страница 7: ...h unbalanced tubes and shields Ensure that all collars cushions and shields are installed properly and in the correct orientation as shown in gure 2 Figure 2 A B C D Cushion Orientation CUSHION NOT US...

Страница 8: ...lectric code and in conformance with the standards for Class I Division 2 hazardous locations Refer to the wiring detail below Figure 3 120VAC 240VAC Model Wiring Diagrams In geographical regions wher...

Страница 9: ...l for foreign objects and close the door The green STO ACTIVE indicator light turns on when the door is properly closed Safe Torque O STO is a safety function that cuts o the supply voltage when the d...

Страница 10: ...n at 85 C 185 F Once the switch opens power to the dual bowl heaters is shut o To reset the switch turn o the MAIN DISCONNECT switch Use a athead screwdriver to remove the silver cap Manually press th...

Страница 11: ...hanism will remain engaged until the motion of the rotor has stopped To stop the motor during normal operation press the PUSH TO STOP button When the RPM INDICATOR reads 0 wait for the locking mechani...

Страница 12: ...ions inside the trunnion shields for excess wear Before each test examine moving parts electrical and mechanical for wear and stress Replace parts as necessary If a tube has broken inside a shield the...

Страница 13: ...the OFF position When the motor controller is functioning properly the green indicator light will be lit If the green light does not turn on when the MOTOR POWER ON button is pressed there are several...

Страница 14: ...p Diameter RPM 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950 1000 1050 1100 1150 1200 1250 1300 1350 20 38 RCF 12 18 26 36 46 59 73 88 104 123 142 163 186 210 235 262 290 320 351 384...

Страница 15: ...mming diagrams may be found at www lk ind com downloads Temperature Controller Quick Programming RPM Quick Programming Timer Quick Programming MODEL LB14 C120C LB14 D120C Tip to tip Diameter RPM 1400...

Страница 16: ...DC Scienti c Grainger Parkes Scienti c www amazon com www coleparmer com www dcscienti c com www grainger com www parkesscienti c com Catalog 2017 L K Industries All Rights Reserved L K INDUSTRIES is...

Отзывы: