KUDO
®
MULTI-MODE WST
®
SYSTEM
Rigging Procedures
VERSION 1.0
KUDO_RM_ML_1.0
w w w . l - a c o u s t i c s . c o m
24 en
3.
On each KUDO
®
enclosure, place the dolly board by attaching both captive BLP.
Figure 33: Installing the dolly boards
4.
Lift / rotate the stack.
A minimum of 3 people are required to lift a stack of 3 KUDO
®
enclosures.
A minimum of 5 people are required to lift a stack of 4 or more KUDO
®
enclosures.
Take care to avoid mechanical shock when landing the stack.
Figure 34: Lifting/rotating the stack
5.
Take down the KBUMP and arrange the enclosures for transportation, as it is shown in steps 6 through 8 in section
6.1.3 (
pay attention to the warning sign
).
!
WARNING
Содержание kudo multi-mode wst
Страница 2: ...w w w l a c o u s t i c s c o m ...
Страница 63: ...w w w l a c o u s t i c s c o m ...