background image

 

 

SB18 

SB18 

SB18 

SB18 SUBWOOFER 

rigging manual

rigging manual

rigging manual

rigging manual    

 

VERSION 1.0 

 

SB18_RM_EN_1-0 

w w w . l - a c o u s t i c s . c o m  

4

4

4

4

 

 

1

1

1

1

 

RI

RI

RI

RIGGING 

GGING 

GGING 

GGING SYSTEM

SYSTEM

SYSTEM

SYSTEM    

The system approach developed by L-ACOUSTICS

®

 consists in providing packaged solutions for loudspeaker system in 

order  to  guarantee  the  highest  and  most  predictable  level  of  performance  at  any  step:  modeling,  installation,  and 
operation. An L-ACOUSTICS

®

 loudspeaker system is the set of components available to form any loudspeaker system 

based  on  one  of  the  full-range  loudspeaker  enclosure  afforded  by  L-ACOUSTICS

®

.  It  includes  enclosures,  rigging 

accessories, loudspeaker cables, amplified controllers, and software applications.  
 
The SB18 subwoofer is especially adapted to the following systems: KUDO

®

, KARA

®

, KIVA/KILO, and to the coaxial XT 

enclosures from L-ACOUSTICS

®

. It extends the low frequency response of a loudspeaker system down to 32 Hz. 

 

The main components involved in the 

SB18

 rigging process are the following: 

 

1.1

 

Loudspeaker enclosure 

SB18 

Compact subwoofer with captive rigging system 

 
 

 

1.2

 

Rigging elements 

M-BUMP

 

Frame for flying or ground-stacking a vertical SB18 and/or KARA array, 
provided with 2 bow shackles (Ø19mm), 4 round-shaped ball-locking pins (5/16”), and 4 T-shaped 
ball-locking pins (5/16”)

 

 

 

M-BAR

 

Extension bar for the M-BUMP frame, 
provided with 2 bow shackles (Ø19mm) and 2 T-shaped ball-locking pins (3/8”) 

 

 

M-JACK

 

Platform feet (x4) for M-BUMP 
provided in a package with KARA-ANGARMEX 

 

 

KARA-
MINIBU 

Frame for flying or stacking a small 

vertical 

SB18 and/or KARA array, 

provided with 2 bow shackles (Ø12mm) and 4 round-shaped ball-locking pins (5/16”)

 

 

 

KARA-
MINIBUEX 

2 Extension arms for the KARA-MINIBU frame, 
provided with 4 T-shaped ball-locking pins (5/16”); 6 screws (M8 x 25mm) and 6 self-locking nuts 

 

 

CLAMP250 

Truss clamp 

 
 

 

1.3

 

Software application 

SOUNDVISION  Proprietary 3D acoustical and mechanical modeling software. 

 
 

1.4

 

Accessories 

SB18PLA 

Removable  front  dolly  board  for  moving  the  SB18  enclosure  and  protecting  its  front  grill  during 
transportation and storage  
 

SB18COV 

Protective cover for transportation and storage 

 

Содержание KIVA SB18

Страница 1: ...SB18 SUBWOOFER SB18 SUBWOOFER SB18 SUBWOOFER SB18 SUBWOOFER RIGGING MANUAL RIGGING MANUAL RIGGING MANUAL RIGGING MANUAL VERSION 1 0 www l acoustics com...

Страница 2: ...ts chain hoists and all additional hardware rigging accessories is respected 8 Respect the maximum configurations and the recommended safety level For safety issue respect the maximum configurations o...

Страница 3: ...n on rigging the system properly and safely Carefully read this document in order to become familiar with these procedures As part of a continuous evolution of techniques and standards L ACOUSTICS res...

Страница 4: ...in components involved in the SB18 rigging process are the following 1 1 Loudspeaker enclosure SB18 Compact subwoofer with captive rigging system 1 2 Rigging elements M BUMP Frame for flying or ground...

Страница 5: ...SB18_RM_EN_1 0 w w w l a c o u s t i c s c o m 5 5 5 5 Main components involved in the SB18 rigging process SOUNDVISION M BUMP M BAR M JACK KARA MINIBU KARA MINIBUEX SB18 SB18COV SB18PLA CLAMP250...

Страница 6: ...ration Mechanical modeling with SOUNDVISION The working load applied to each linking point along with the corresponding safety factor will depend on numerous variables linked to the composition of the...

Страница 7: ...d configuration The cardioid configuration is in an array of 4 subwoofers with 1 reversed element Refer to the subwoofer user manual for details about the CARDIOID operating mode Any of the following...

Страница 8: ...Assemble a stack of 2 SB18 enclosures logo down under the motor location Refer to PROCEDURE A Lower the array until it rests on the new stack Attach the bottom SB18 enclosure of the first stack to th...

Страница 9: ...n the rigging track of the adjacent enclosure Insert the pin through both the rigging point of the second element and the SB18 rigging arm PROCEDURE A 4 different scenarios Attaching two SB18 enclosur...

Страница 10: ...frame by inserting the M BAR studs into the M BUMP slits Choosing between the front or rear extension At this step install both M BAR the same way i e protruding at the front or the rear of the M BUM...

Страница 11: ...an M BAR b M JACK being secured to the second hole of an M BAR An M BAR M JACK assembly being attached to the M BUMP in rear extension position A or B The stacking platform placed in rear extension M...

Страница 12: ...to the M BUMP or M BAR s in the hole s providing the desired site angle If needed for the chosen flying option attach one or two M BAR to the M BUMP a Remove both pins from the M BAR s b Place the M...

Страница 13: ...stallation as a front or rear extension can be achieved wherever the KARA MINIBUEX are installed However it is recommended at this step to anticipate the front or rear extension so as to keep the lase...

Страница 14: ...number of enclosures Option 4 2 motor points 2 shackles at fixed front and rear positions holes 0 and 16 spacing 900 mm 35 inch 1 M BAR at 4 possible positions rear or front extension A or B Lock the...

Страница 15: ...he rear extension M BAR hole numbering 0 to 16 and positions A or B in the front extension Rear 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Position A on the M BUMP Position B on the M BUMP Front Rear Fr...

Страница 16: ...rigging positions when attaching the structure to an enclosure front or rear extension 34 discrete setting choices for which the angle value depends on the number of enclosures With an SB18 array in...

Страница 17: ...P or KARA MINIBU with identification plate right side up Undo the four Torx bolts on the laser support plate T20 bit 7 mm hex key Place the LAP TEQ on the laser support plate with laser lens towards t...

Страница 18: ...ence SB18_RM_EN_1 0 Distribution date September 25 2012 2012 L ACOUSTICS All rights reserved No part of this publication may be reproduced or transmitted in any form or by any means without the expres...

Отзывы: