background image

 

 

 

 

 

 

SB18_RM_EN_1-0 

w w w . l - a c o u s t i c s . c o m  

11

11

11

11

 

 

 

 

PROCEDURE B

 : Preparing the M-BUMP stacking platform 

 

 

 

A shackle being removed from an M-BAR

 

M-JACK being secured to the second hole of an M-BAR 

 

 
 
 
 
 
 
 
 
 
 
 

 

 

An M-BAR/M-JACK assembly being attached to the M-BUMP in rear extension (position A or B) 

 
 
 
 
 
 
 

 
 
 
 

 

 

 

 

The stacking platform placed in rear extension 

 

M-JACK height being adjusted 

 
 
 
 
 
 

 

END 

 

                                       

The M-BUMP stacking platform ready for the enclosures 

Laser  

 

Towards audience 

Base nut 

Knob 

Base 

Locking nut 

Содержание KIVA SB18

Страница 1: ...SB18 SUBWOOFER SB18 SUBWOOFER SB18 SUBWOOFER SB18 SUBWOOFER RIGGING MANUAL RIGGING MANUAL RIGGING MANUAL RIGGING MANUAL VERSION 1 0 www l acoustics com...

Страница 2: ...ts chain hoists and all additional hardware rigging accessories is respected 8 Respect the maximum configurations and the recommended safety level For safety issue respect the maximum configurations o...

Страница 3: ...n on rigging the system properly and safely Carefully read this document in order to become familiar with these procedures As part of a continuous evolution of techniques and standards L ACOUSTICS res...

Страница 4: ...in components involved in the SB18 rigging process are the following 1 1 Loudspeaker enclosure SB18 Compact subwoofer with captive rigging system 1 2 Rigging elements M BUMP Frame for flying or ground...

Страница 5: ...SB18_RM_EN_1 0 w w w l a c o u s t i c s c o m 5 5 5 5 Main components involved in the SB18 rigging process SOUNDVISION M BUMP M BAR M JACK KARA MINIBU KARA MINIBUEX SB18 SB18COV SB18PLA CLAMP250...

Страница 6: ...ration Mechanical modeling with SOUNDVISION The working load applied to each linking point along with the corresponding safety factor will depend on numerous variables linked to the composition of the...

Страница 7: ...d configuration The cardioid configuration is in an array of 4 subwoofers with 1 reversed element Refer to the subwoofer user manual for details about the CARDIOID operating mode Any of the following...

Страница 8: ...Assemble a stack of 2 SB18 enclosures logo down under the motor location Refer to PROCEDURE A Lower the array until it rests on the new stack Attach the bottom SB18 enclosure of the first stack to th...

Страница 9: ...n the rigging track of the adjacent enclosure Insert the pin through both the rigging point of the second element and the SB18 rigging arm PROCEDURE A 4 different scenarios Attaching two SB18 enclosur...

Страница 10: ...frame by inserting the M BAR studs into the M BUMP slits Choosing between the front or rear extension At this step install both M BAR the same way i e protruding at the front or the rear of the M BUM...

Страница 11: ...an M BAR b M JACK being secured to the second hole of an M BAR An M BAR M JACK assembly being attached to the M BUMP in rear extension position A or B The stacking platform placed in rear extension M...

Страница 12: ...to the M BUMP or M BAR s in the hole s providing the desired site angle If needed for the chosen flying option attach one or two M BAR to the M BUMP a Remove both pins from the M BAR s b Place the M...

Страница 13: ...stallation as a front or rear extension can be achieved wherever the KARA MINIBUEX are installed However it is recommended at this step to anticipate the front or rear extension so as to keep the lase...

Страница 14: ...number of enclosures Option 4 2 motor points 2 shackles at fixed front and rear positions holes 0 and 16 spacing 900 mm 35 inch 1 M BAR at 4 possible positions rear or front extension A or B Lock the...

Страница 15: ...he rear extension M BAR hole numbering 0 to 16 and positions A or B in the front extension Rear 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Position A on the M BUMP Position B on the M BUMP Front Rear Fr...

Страница 16: ...rigging positions when attaching the structure to an enclosure front or rear extension 34 discrete setting choices for which the angle value depends on the number of enclosures With an SB18 array in...

Страница 17: ...P or KARA MINIBU with identification plate right side up Undo the four Torx bolts on the laser support plate T20 bit 7 mm hex key Place the LAP TEQ on the laser support plate with laser lens towards t...

Страница 18: ...ence SB18_RM_EN_1 0 Distribution date September 25 2012 2012 L ACOUSTICS All rights reserved No part of this publication may be reproduced or transmitted in any form or by any means without the expres...

Отзывы: