SB18_RM_EN_1-0
w w w . l - a c o u s t i c s . c o m
11
11
11
11
PROCEDURE B
: Preparing the M-BUMP stacking platform
a
A shackle being removed from an M-BAR
b
M-JACK being secured to the second hole of an M-BAR
An M-BAR/M-JACK assembly being attached to the M-BUMP in rear extension (position A or B)
The stacking platform placed in rear extension
M-JACK height being adjusted
END
The M-BUMP stacking platform ready for the enclosures
Laser
Towards audience
Base nut
Knob
Base
Locking nut