13
rev. 2011-5-26
INITIAL START-UP INSTRUCTIONS
DO NOT TURN ON THE POWER TO THE SPA WHEN THE SPA IS EMPTY OR PARTIALLY FILLED.
1.
Ensure the circuit breaker to the spa is off.
2.
Rotate all the jets in the spa to a counterclockwise position (fully open position).
3.
Ensure the gate valve is open fully. Pull the “T” handle on the gate valve (located near the jet
pump) all the way up. When opened, there will be approximately 2” (5 cm) of metal rod visible.
4.
Check the heater unions, pump unions, and pump plugs to assure that they are tight to prevent the
possibility of leakage in the equipment bay.
5.
Close and cap the hose bib located in the equipment compartment. This is used for draining the
spa.
6.
Fill the spa with water to a level of approximately 6” (15 cm) below the top of the spa. To prevent
the pumps being air locked, it is recommended to fill the water at the filter bucket area.
7.
Turn on the circuit breaker. The control panel will go through some numbers, then
Pr
will be
displayed for about 4 minutes.
Pr
depicts priming mode. Turn on the pumps one at a time to
ensure adequate water flow. Once the water is flowing smoothly, press the
Warm
or
Cool
key to
exit the priming mode. If there is no water flow through the jets, the pumps need to be primed to
eliminate air lock.
Pump Priming
•
Turn off the power to the spa.
•
Remove the handle from the jet selector valve supplied by the pump you are priming.
•
Loosen the pump union on the suction side of the pump until some water starts gushing out of
the pump union.
•
Tighten the pump union.
8.
After the priming mode, the control panel will display two dashes
--
. The system will take about 2
minutes to register the water temperature. Set the desired temperature by pressing the
Warm
or
Cool
key.
9.
Re-attach the front cabinet panel.
10. Due to the size of the swim spa, heating will occur at a rate of approximately 0.5°F (0.3°C) per
hour. For spas equipped with an additional optional heater, heating will occur at a rate of
approximately 1°F (0.6°C) per hour.
11. After completing the above steps, it is necessary to ensure proper water chemistry. See the Water
Balance section in the manual.
12. Place the thermal cover on the spa to conserve energy and to keep it ready for use.
Содержание IN-FIT
Страница 1: ...2011 North American L A Spas IN FIT Swim Spa Owner s Manual ...
Страница 30: ...WIRING DIAGRAM 29 rev 2011 5 26 ...