2PG/2PH
1-5-14
1-5-6 Transfer/separation section
(1) Detaching and refitting the transfer roller
Procedure
1. Remove the developing unit (See page 1-5-
11).
2. Remove the drum unit (See page 1-5-12).
3. Slide the paper chute guide and unhook the
hooks.
4. Remove the paper chute guide.
Figure 1-5-19
Hook
Hook
Hook
Hook
Paper chute guide
Paper chute guide
Содержание ECOSYS P2035d
Страница 1: ...SERVICE MANUAL Published in Nobember 2013 842PH111 2PHSM061 Rev 1 ECOSYS P2035d ECOSYS P2135d...
Страница 4: ...This page is intentionally left blank...
Страница 10: ...This page is intentionally left blank...
Страница 18: ...2PG 2PH 1 1 6 This page is intentionally left blank...
Страница 21: ...2PG 2PH 1 2 3 1 Removing the tapes Procedure 1 Remove three tapes Figure 1 2 3 Tape Tape Tape...
Страница 38: ...2PG 2PH 1 3 14 This page is intentionally left blank...
Страница 59: ...2PG 2PH 1 5 5 5 Unhook seven hooks and then remove the left cover Figure 1 5 6 Left cover Hooks...
Страница 88: ...2PG 2PH 1 5 34 This page is intentionally left blank...
Страница 106: ...2PG 2PH 2 1 14 Figure 2 1 21 Paper exit section block diagram EXITN YC307 4 Fuser unit Exit sensor Control PWB...
Страница 108: ...2PG 2PH 2 1 16 This page is intentionally left blank...
Страница 112: ...2PG 2PH 2 2 4 This page is intentionally left blank...
Страница 120: ...2PG 2PH 2 3 8 This page is intentionally left blank...
Страница 126: ...2PG 2PH 2 4 6 This page is intentionally left blank...