Kyland Telecom
1.12
Cables Wiring
Wiring shall accord with following conditions:
1
.
Before laying, verify accordance of the specification, model and quantity of all
cables and wires with construction drawings and requirements under the
contract.
2
.
Before laying, check whether cables and wires are damaged and ensure they
have ex-works records and quality guarantee, and other certificates that prove
their quality.
3
.
The specification, quantity, route, and position of cables and wires shall accord
with design requirements under construction drawings. The laying length of each
cable and wire shall be determined according to real position.
4
.
In laying, cables and wires shall not have breaking or connectors except ends.
5
.
User cables shall be separated from power cables.
6
.
In walkways, cables and wires shall be laid straightly and tidily and they shall
have even, smooth and straight bends.
7
.
In wire casings, they shall be straight without overreaching casings to block
holes of other cables. At exits or bends of casings, cables shall be bundled and
fastened.
8
.
When cables, power cables and earthing wires are in a casing, they shall not
overlap. If they are over long, they shall be tidily coiled and placed in the middle
of chutes and they shall not be placed on other cables and wires.
9
.
Two ends of the cable should be marked briefly to be maintained easily.
-
21
-
Содержание KIEN8000
Страница 1: ...KIEN8000 Industrial Ethernet Switch User s Manual KYLAND Telecom Technology Co Ltd ...
Страница 6: ......
Страница 8: ...1 16 System Configurations 25 Appendix A Twisted pair and Pin Distribution 26 II ...
Страница 14: ......
Страница 28: ...KIEN8000 User Manual Figure 4 3 KIEN8000 s 1st wall mounting dimensions 18 ...