Pallet packaging
52
Hydraulics
In the case of pallet packaging, the machine hydraulics are completely
connected up.
Couple the machine to the tractor.
Do
not
couple the PTO shaft.
Connect the machine hydraulics to the tractor.
Position the main frame horizontally with the tractor's power lever.
Fitting the rotor
chassis
The rotor gears are pre-fitted on the two lift arms. Proceed as follows:
Fit the wheels onto both rotor chassis.
See »Fitting the wheels«, page 37.
Use the tractor's hydraulic control device to fold back the lift arms
until the underside of the rotor gears is around 70 cm above the
ground.
Secure the tractor against rolling away, shut off the engine and
remove the ignition key.
Close the ball valve.
Main frame
Lift arm
Rotor gear
Rotor chassis
“Left” sticker
Содержание Vicon Andex 724
Страница 31: ...Crate packaging 31 Standard version with hydraulic transport chassis ...
Страница 72: ...Final operations 72 ...