Pallet packaging
49
Pallet packaging
Requirements
•
Suitable flat surface approx. 10 x 10 m as assembly space.
•
Lifting gear with lifting accessories for at least 1,500 kg.
•
Floor conveyor (pallet truck or fork lift) with a fork length of at least
1,800 mm.
•
Supports for safely depositing machine parts.
•
Spanners for tightening bolts.
Preparations for
assembly
Place the bottom of the pallet flat without damaging parts lying on
it.
Take out loose parts (wheels, axles, boxes etc.).
Clear plenty of space around larger components to make access
easier.
Remove the transport locking device on the lift arms.
Checking the scope
of delivery
Check that the scope of delivery is complete.
In the event of missing, incorrect or damaged parts, fill in the
"REPORT MISSING PARTS" form and send it to the "ORDER
DESK" in Kerteminde straight away.
Removing the
surface protection
Remove the surface protection (e.g. Tectyl) with which the bare
surfaces (such as tine arms, tine supports and bearing shafts)
have been coated.
Grease the bare surfaces using a brush.
Observe the safety information
Observe the safety information when carrying out all work.
Disregard for safety information can lead to serious or fatal injury.
Ensure that hydraulic connections are correct
Before lowering the implement, you must check that the hydraulic
lines are correctly connected. Wrongly connected hydraulic hoses
can trigger unpredictable movements of the machine. Serious or
fatal injury may be caused as a result.
No persons within the slewing range
There is an acute risk of injury within the slewing range from
machine parts which are slewing or folding. Serious or fatal injury
would be caused as a result.
Содержание Vicon Andex 724
Страница 31: ...Crate packaging 31 Standard version with hydraulic transport chassis ...
Страница 72: ...Final operations 72 ...