12
General data and equipment
0°
Construction
12
Timing process:
1. Remove all tine carriers.
2. Assemble one central tine carrier and rotate it so that the tines are in-line
with the axis of the trough (reference rotor).
3. Assemble the two adjacent tine carriers with a phase angle of b5° and +15°.
Procedure: position the tine carrier at 90° to the reference tine carrier and rotate it until you find the
first
possible
assembly position.
The phase angle must not exceed 15°
. If it is not possible to find a
position between 5° and 15° rotate the tine carrier 180° and try again. NB The alignment of three adjacent
tine carriers must be convergent (or divergent), not parallel. (Fig.1)
4. Rotate the newly assembled tine carrier so that it is in-line with the trough (as in step 2)
5. Assemble the next adjacent tine carrier so that the phase angle is between -5° and -15° (as in step 3
but in the opposite direction). (Fig.2)
6. Proceed in this way for all remaining tine carriers
.
-75°
75°
30°
45°
60°
-30° -45 -60 -15
Resetting operation of tine carriers’ ” TIMING”,
Содержание H Series
Страница 4: ...4 General data and equipment 4 3100 mm 1650 mm 2900 mm Road transport Total weight 3 900 kg Rear view ...
Страница 5: ...5 5 General data and equipment Road transport 3100 mm 1650 mm Total weight 3 900 kg ...
Страница 6: ...6 6 Rear view Front view Road transport General data and equipment 2900 mm 3100 mm ...
Страница 7: ...7 General data and equipment Total weight 3 900 kg 7 Working position ...
Страница 8: ...8 8 Rear view Front view General data and equipment Working position 6000 mm ...
Страница 9: ...9 9 700 mm 1730 mm 1500 mm Working position Total weight 3 900 kg General data and equipment ...
Страница 14: ...14 General data and equipment Construction 14 ...
Страница 17: ...17 17 General data and equipment Leveling bar equipment ...
Страница 31: ...31 31 4 Technical specifications ...
Страница 32: ...32 Basic hydraulic circuit std equipment schematics hydraulic 32 ...
Страница 33: ...33 33 Basic hydraulic circuit std equipment Distributor block ...
Страница 34: ...34 Basic hydraulic circuit std equipment Roller sequence circuit 34 ...
Страница 35: ...35 35 Basic hydraulic circuit std equipment Folding circuit ...
Страница 36: ...36 36 Basic hydraulic circuit std equipment Transport lock circuit ...
Страница 37: ...37 37 Basic hydraulic circuit std equipment Roller lift circuit ...
Страница 38: ...38 38 Basic hydraulic circuit std equipment Line markers circuit optional ...
Страница 39: ...39 39 Hydraulic circuit electro hydraulic controls schematics hydraulic ...
Страница 40: ...40 40 Hydraulic circuit electro hydraulic controls Connections and functions ...
Страница 41: ...41 41 Hydraulic circuit electro hydraulic controls Folding transport lock circuit ...
Страница 42: ...42 42 Hydraulic circuit electro hydraulic controls Roller lift circuit ...
Страница 43: ...43 43 Hydraulic circuit Control panel schematics hydraulic ...
Страница 44: ...44 44 Hydraulic circuit Control panel Junction Box Control box ...
Страница 45: ...45 45 Hydraulic circuit Control panel Interface on coulter bar brackets ...
Страница 46: ...46 46 Hydraulic circuit Control panel Line marker function ...
Страница 47: ...47 47 Hydraulic circuit Control panel Pre emergence marker function ...
Страница 48: ...48 48 Hydraulic circuit Control panel Coulter bar lift ...
Страница 49: ...49 49 Hydraulic circuit Control panel Coulter bar pressure ...
Страница 50: ...50 50 Hydraulic circuit Control panel Pre emergence marker function ...
Страница 52: ...52 52 Requests ...