Process to Stack a Door
2-10
KVAL Manual
Process to Stack a Door
Ensure factory air is present at the ON-3V and the other machines.
Note:
Power the all the machines in the line.
Snapshot
Request Access In.
Load Pallet.
Request Access Out.
Reset Button.
Home Machine.
If needed, setup feed through or
change door length.
Start the machining process
Stacking Process begins
1.
Power up the
ON-3V.
See “Powering Operations
for the ON-3V” on page 2-6.
2.
Push the
Request Access
Button
3.
Load the
pallet
into the staging area.
4.
Pull out the
Request Access
Button
.
5.
Push the
Reset Button
6. Home
the Machine.
7.
If
a change in normal process is needed, select
the
Feed Through
button or change the door
length.
See “About the Stacker Main Screen” on
page 2-19
8.
Start the process at the main machine of the
line.(DLN-CD, 990 series, Face, etc)
Содержание ON-3V
Страница 3: ...KVAL ON 3V Operation Manual KVAL ON 3V Operation Manual Your Feedback is Welcome NOTE ...
Страница 4: ...KVAL ON 3V Operation Manual ...
Страница 8: ...KVAL ON 3V Operation Manual Table of Contents ...
Страница 23: ...Getting Help from KVAL 1 15 KVAL Manual Page Intentionally Left Blank ...
Страница 47: ...About the Diagnostic Screen 2 23 About the Diagnostic Screen Diagnostic Screen FIGURE 2 5 Diagnostics Screen ...
Страница 68: ...Appendix About Switches and Sensors 3 20 KVAL Manual ...
Страница 70: ...Index Kval ON 3V ...
Страница 71: ......