background image

 

___________________________________________________________________________________________ 

4

 

EA63-2.5

 

2.5 

The  following  notes  (

)  apply  to  the 

interconnection diagrams : 

2.5.1  If external pot is not used, short terminals 6 and 7. 
2.5.2  Item not supplied by KUTAI ELECTRONICS. 

2.5.3  Select fuses with high interrupting capacity. 
2.5.4  Excitation On / Off Switch ( If used). 
 

 

 

 

Operational Test 

Figure 4 

Interconnection Diagram, 120 / 240 V Nominal, 

1-phase, 3-Wire 

Figure 5

 

 

 

Interconnection Diagram, 120 / 208 V Nominal, 

3-phase, 4-Wire, Wye Connection 

Figure 6 

Interconnection Diagram, 277 / 480 V Nominal, 

3-phase, 4-Wire, Wye Connection 

Figure 7 

  Use only original supplied spare protection fuse for fuse replacement. 

  Appearance and specifications of products are subject to change for improvement without prior notice. 

Содержание EA63-2.5

Страница 1: ...Ln 201 Qianfu St Qianzhen Dist Kaohsiung City 80664 Taiwan EA63 2 5 Generator Automatic Voltage Regulator Operation Manual Self Excited Automatic Voltage Regulator Compatible with Basler AVC63 2 5 Use for reference only and not a genuine Balser product Use with Kutai EP200 Paralleling Module for parallel operation ...

Страница 2: ...External Voltage Adjustment Storage Temperature 40 to 85 C Max 15 5K ohms 1 watt potentiometer Relative Humidity Max 95 Vibration 1 5 Gs 5 30 Hz Voltage Regulation 5 0 Gs 30 500 Hz Less than 1 with 4 engine governing Dimensions Build Up Voltage 101 0 L x 69 0 W x 22 0 H mm 5 Vac residual volts at power input terminal Weight 107 g 2 TYPICAL FREQUENCY COMPENSATION CURVES See Figure 1 1 When the freq...

Страница 3: ...hing 2 3 3 Slowly adjust the regulator VOLT ADJ CW until the generator output voltage reaches the nominal value If used adjust the remote VOLT ADJ to set the generator voltage to the exact value desired RESULT Voltage should build up to rated value If voltage does not build up to rated value check generator for short or excessive load 2 3 4 Check regulator under normal operating and loading condit...

Страница 4: ...h high interrupting capacity 2 5 4 Excitation On Off Switch If used Operational Test Figure 4 Interconnection Diagram 120 240 V Nominal 1 phase 3 Wire Figure 5 Interconnection Diagram 120 208 V Nominal 3 phase 4 Wire Wye Connection Figure 6 Interconnection Diagram 277 480 V Nominal 3 phase 4 Wire Wye Connection Figure 7 Use only original supplied spare protection fuse for fuse replacement Appearan...

Отзывы: