background image

Gateway component Sercos

15 / 23

4.4 Installing a Gateway in the Control Cabinet

◦ Hold the raster element of the gateway on the DIN rail.

◦ Press down the locking elements towards the gateway.

◦ Make sure that the gateway is firmly attached to the DIN rail.

Installation

Содержание Sercos Series

Страница 1: ...User manual Gateway component Sercos DO0227R00 6 28 2016...

Страница 2: ...tus LEDs 10 4 Installation 11 4 1 Preparations for Trouble free Operation 11 4 2 Requirements 13 4 3 Connecting Gateway Components 14 4 4 Installing a Gateway in the Control Cabinet 15 4 5 Connecting...

Страница 3: ...use for other purposes is not permitted without the express written consent of KUNBUS GmbH Contraventions shall result in compensation for damages Trademark protection KUNBUS is a registered trademar...

Страница 4: ...used incorrectly damage is due to non observance of the operating manual damage is caused by inadequately qualified personnel damage is caused by technical modification to the product e g soldering 1...

Страница 5: ...d electronic circuits basic knowledge of SERCOS work in electrostatic protected areas locally applicable rules and regulations for occupational safety 2 2 Symbols The symbols used have the following m...

Страница 6: ...2 gateway components that master one specific protocol each You can combine these gateway components as you wish This design offers you a high degree of flexibility since you can exchange the individ...

Страница 7: ...tration 2 Front view 1 Status LEDs for signal display 2 2 rotary coding switches for setting the station number 3 Fieldbus connection RJ45 socket for the connection to SERCOS and or general LAN Auto N...

Страница 8: ...n 3 Top 1 Fieldbus connection RJ45 socket for connection to the fieldbus 2 pcs see figure front view 2 Interconnect ports for interconnecting the gateway components 3 Locking clamps for securely attac...

Страница 9: ...Gateway component Sercos 9 23 Bottom 1 2 Illustration 4 Bottom 1 Mains connection with 24 V power supply 2 Locking clamps for securely attaching the gateway component to the DIN rail Overview...

Страница 10: ...ex change takes place off No connection SIII Off No communication with Sercos orange on Communication phase 0 active orange flashes 1x green Communication phase 1 active orange flashes 2x green Commun...

Страница 11: ...he following groups should be routed separately from each other Group Line A Data and power supply lines for DC voltage below 60 V AC voltage below 25 V B Data and power supply lines for DC voltage be...

Страница 12: ...for the cross section of the potential equalization cable 16 mm2 for potential equalization cables of up to 200 m in length 25 mm2 for potential equalization cables of more than 200 m in length Use po...

Страница 13: ...at a sufficient distance from other devices NOTICE Your gateway could be damaged if temperatures are too high Make sure that the ambient temperature in the control cabinet is less than 60 C Keep the...

Страница 14: ...nents Connect an interconnect port to each gateway component using the plug in jumper product number PR100204 Illustration 6 Connecting gateway components You can now install the gateway in the contro...

Страница 15: ...4 4 Installing a Gateway in the Control Cabinet Hold the raster element of the gateway on the DIN rail Press down the locking elements towards the gateway Make sure that the gateway is firmly attache...

Страница 16: ...ion if the shield of the fieldbus cable is connected to the potential equalization with lower impedance when entering the control cabinet NOTICE Connect each of the two gateway components to the power...

Страница 17: ...IBUS supports 488 bytes In conjunction with Sercos PROFIBUS this means that s 250 bytes are transmitted and updated cyclically 5 2 Setting Sercos Address You can set the Sercos Address for the gateway...

Страница 18: ...n 7 Coding switch The station address is set as a hexadecimal Example Setting the station number 18 Set switch x16 1 to position 2 Set switch x1 2 to position 1 The settings yield the hexadecimal valu...

Страница 19: ...the gateway component You can set an address in a value range between 1 and 511 Connection Length Leaving Slave 18 Determines the maximum lengths of the data transferred cyclically between the Sercos...

Страница 20: ...pose the same logon data as for the web server is valid Web Server Files You will find files for the web server in the Web subfolder 6 3 TFTP Server You can access the the gateway component via TFTP T...

Страница 21: ...4 V DC Power consumption during operation cyclical data exchange 100 mA Status display LED Environmental conditions Ambient temperature 0 60 C Storage temperature 25 60 C Humidity 93 at 40 C Condensin...

Страница 22: ...1 3 1 Sercos Communication Profiles Classes SCP_FixCFG SCP_TFTP SCP_NRTPC and SCP_SWC Connection length for input and out put can be set individually up to a max of 250 bytes incl Connection Control a...

Страница 23: ...Gateway component Sercos 23 23 Illustration 10 Front dimensions Technical Data...

Отзывы: