Kuhse KEA 293 PST Скачать руководство пользователя страница 11

    Operating instructions KEA 293 PST  - 

11 / 12

 -  File: 

BA_KEA 293 PST_EN_Ver 2016-07-01.doc

 

 

11 

 

 

 

Alfred Kuhse GmbH

 

Telephone: +49(0)4171-798-0 

E-mail: [email protected] 

Subject to technical changes 

An der Kleinbahn 39,21423 Winsen 

Fax: +49(0)4171-798-117 

http://www.kuhse.de 

 

 

 
 

15.2. 

Position of the voltage selector and connection terminals 

 

 

 

Содержание KEA 293 PST

Страница 1: ...All functions allocated to the genset are included for sprinkler operation Ten displays can be selected as alarms or operational indicators Provision has been made for remote acknowledgement of alarms...

Страница 2: ...5 8 3 Test operating mode 6 8 4 Sprinkler operation 6 9 Error messages Programmable operation indicators 6 9 1 Use as an operational indicator 6 9 2 Use as an error message 6 9 3 Alarms 9 and 10 6 9 4...

Страница 3: ...unit The connection regulations must be observed 3 The installation and commissioning must only be carried out by sufficiently qualified personnel 4 Applicable regulations especially those of the VDE...

Страница 4: ...can be selected using the keys 6 2 Start key The motor can be started in MANUALoperating mode by actuating this button If the motor needs to be pre heated the pre heating device must be externally co...

Страница 5: ...m is controlled by three criteria That s why this message has expired needs to be interpreted The message is controlled if the genset has not started at the end of the starting program This message FA...

Страница 6: ...t is free Stopping can then be carried out via the OFF operating mode or always via Emergency Stop 9 Error messages Programmable operation indicators Any of the 10 LEDs can either display an error mes...

Страница 7: ...et is immediately ready for operation in the event of a start request sprinkler request 10 Remote acknowledgement Existing alarms can be remotely acknowledged with a signal L on terminal 32 A constant...

Страница 8: ...kler operation run on time 0 sec Stop time 30 sec 13 2 Start process gas engine Starter on If the starter speed is exceeded the switching on of the ignition is delayed e g after 2 sec Then another 2 s...

Страница 9: ...70 C Operation 10 C 50 C Standards regulations DIN VDE 0160 14 2 Auxiliary voltage Switchable 9 12 15V or 14 24 35V DC 14 3 Analogue input Battery voltage monitor 14 4 Digital inputs and outputs Input...

Страница 10: ...293 PST_EN_Ver 2016 07 01 doc 10 Alfred Kuhse GmbH Telephone 49 4171 798 0 E mail kuhse kuhse de Subject to technical changes An der Kleinbahn 39 21423 Winsen Fax 49 0 4171 798 117 http www kuhse de 1...

Страница 11: ...ST_EN_Ver 2016 07 01 doc 11 Alfred Kuhse GmbH Telephone 49 0 4171 798 0 E mail kuhse kuhse de Subject to technical changes An der Kleinbahn 39 21423 Winsen Fax 49 0 4171 798 117 http www kuhse de 15 2...

Страница 12: ...Operating instructions KEA 293 PST 12 12 File BA_KEA 293 PST_EN_Ver 2016 07 01 doc 16 Drilling template Scale 1 1 print without scaling...

Отзывы: