
Power tiller
30
EL82
Putting into service
Adjusting the category
- Loosen screw (1).
- Remove the 2 nuts (3).
- Position lower coupling yokes (4) opposite free holes.
- Tighten the 2 nuts (3).
• Torque: 21 daN m (155 lbf ft).
- Adjust sliding guard (2) position to fully cover machine
front part between lower coupling yokes and machine
ends.
• Distance D between sliding guard and lower
coupling yokes must not exceed 60 mm (2.4’’).
- Tighten screw (1).
• Torque: 8.5 daN m (63 lbf ft).
- Proceed the same way on the other side.
Coupling the machine
- Park the machine on an even fairly level ground.
- Lower the tractor three-point linkage.
- Insert lower hitch pins and secure them with lynch
pins.
- Attach the top link to the hitch pin.
- Secure hitch pin with lynch pin.
- Adjust the top link length so that the machine is
horizontal with regards to the ground.
4
3
2
1
3
D