Rotary cultivators
22
EL53
Putting into service
$
Putting into service
1. Coupling and uncoupling
Description of coupling elements
- A PTO shaft 1 3/8’’ - 6 splines.
- A 3-point hitch.
Preparing the tractor
The machine adapts to tractors fitted with a 3-point hitch
coupler category 1 or 1N.
The tractor nominal PTO speed must be 540 min
-1
.
Hitch pin parallelism
Adjust tractor lift rods so that hitch pins are parallel to the
ground.
Содержание EL53
Страница 1: ...KN172AGB C OPERATOR S MANUAL Rotary cultivators EL53 KN172AGB C English 11 2009...
Страница 2: ......
Страница 52: ...Rotary cultivators 50 EL53 Limited warranty Limited warranty...
Страница 53: ...Limited warranty Rotary cultivators EL53 51...
Страница 54: ......
Страница 55: ......
Страница 56: ......