Putting into service
Rotary cultivators
EL23
29
Uncoupling the machine
- Lower and lock parking stand.
- Lower the tractor three-point linkage to rest the
machine on the ground.
- Uncouple the PTO shaft from the tractor.
- Detach the top link from the machine end.
- Secure primary PTO shaft using chain (1).
- Uncouple the lower links.
The machine is uncoupled.
Handling
Use lifting point (1).
When lifting this equipment, use appropriate
lift straps, chains or any other equipment, in
perfect working order, complying with safety
standards in force for this type of equipment,
and with capacities that exceed the total
weight of the unit, as listed in this manual.
Содержание EL23
Страница 1: ...OPERATOR S MANUAL Rotary cultivators EL23 KN185AGB B English 03 2008...
Страница 2: ......
Страница 37: ...Optional equipment Rotary cultivators EL23 35 2 Category 1 ASAE 5279 Quick Hitch Compatible Kit no 1209270...
Страница 42: ...Rotary cultivators 40 EL23 Limited warranty LIMITED WARRANTY...
Страница 43: ...Limited warranty Rotary cultivators EL23 41...
Страница 44: ......