- 27 -
MACHINE ASSEMBLY
Place the front pannel in the open position on
top of the conditioning hood.
Slide the articulation tube in the left front shield
eyelet.
Install the right front shield, making sure to in-
sert the articulation tube in the right front shield
eyelet.
Secure the shield with the screws previously
removed.
Mount the left front signalling panel and light
onto the side gearbox hood (use the clamp
to secure the electric wire). The mounting
screws are pre-fitted on the hood.
Position the panel with the red corner on top
on the outside of the machine.
Connect the electric wire in place on the
conditioning unit.
Note : Machines delivered to North America
are supplied with specific signalling elements.
Содержание FC 303 GC
Страница 1: ...PREDELIVERY INSTRUCTIONS FC 303 GC FC 353 GC FC 353 RGC N 95131 B GB 01 2004 ...
Страница 38: ... 37 ...