Maintenance
As necessary
2. Place rubber track on the sprocket.
3. Place a steel tube (1) in the rubber track
and rotate the sprocket slowly towards
opposite direction.
4. Rotate the sprocket till the steel tube (1)
closes to the pensioner and the rubber track
is lifted off the pensioner and then stop the
rotation of sprocket.
5. Slide inward the rubber track to install it
onto the pensioner and then pull out the
steel tube.
6. Check rubber track for secure installation
on sprocket and pensioner.
7. Tension the rubber track to standard
tension.
Refer to the “Checking and adjustment of
track tension” in page 5-26 for details.
8. Install the other rubber track by same
procedure.
5-47
Installation
1. Lift the machine body by working device.
Содержание XN12-8
Страница 9: ...Safety 1 1 ...
Страница 44: ...Safety Safety Signs 1 36 ...
Страница 49: ...Controls 2 1 ...
Страница 55: ...2 7 Records ...
Страница 64: ...Operations 3 1 ...
Страница 90: ...Operations Parking of This Machine Locking Ensure to lock the following parts 3 27 ...
Страница 96: ...Transportation 4 1 ...
Страница 100: ...Transportation Lifting of Machine 4 5 unit mm ...
Страница 102: ...Maintenance 5 1 ...
Страница 123: ...5 22 Records ...
Страница 135: ...5 34 Records ...
Страница 139: ...5 38 Records ...
Страница 151: ...Troubleshooting 6 1 ...
Страница 163: ...Parameters 7 1 ...
Страница 167: ...Parameters Lifting power 7 5 ...
Страница 168: ...7 6 Records ...
Страница 169: ...Accessories 8 1 ...
Страница 178: ...8 10 Records ...
Страница 180: ...Optional accessories Canopy 8 12 ...
Страница 181: ...Parts number position Upper frame number 20060001 8 13 ...