LIFTING OF THE EXCAVATOR
52
2. Attaching the steel cables or straps.
(1) Always hook the excavator at three points. (one
on the boom and left and right of the dozer)
(2) Always use a shackle on each lifting hole when
attaching the cables or straps.
(3) Keep the angle between the front and rear cables
or straps within 49 .
A
While lifting, carefully keep the machine well balanced
with its center of gravity in mind.
A
Do not lift the machine with the boom swinging or the
upper structure swiveling.
3. Tackle
The weights of the excavators and the recommended
tackle for lifting these loads are mentioned in the
following table. Choose components having enough
strength.
*Excavator Weight: With CAB, steel tracks.
Steel wire: 6X24
4. Lifting
(1) Lift slowly and safely
(2) Do not enter the excavator area when lifting.
(3) Lift the excavator horizontally. (Modify cable or
strap connections according to needs)
Maximum strength
for example : (JIS G 35 25) - "6 x24"
(1) Cable or strap
(A) 49 or less
Excavator Weight*
CAB
CANOPY
3835 kg
3685 kg
Load / Cable
12219 N
Minimum Wire Diameter
(Safety factor=6)
14 mm or more
Diameter
zinc-plated
not zinc-plated
10 mm (3/8)
45.8 KN
49.3 KN
12.5 mm (1/2)
71.5 KN
77 KN
14 mm (9/16)
89.7 KN
96.6 KN
16 mm (5/8)
117 KN
126 KN
18 mm (45/64)
148 KN
160 KN
Содержание U35-4
Страница 16: ...SAFE OPERATION 8 6 DANGER WARNING AND CAUTION LABELS ...
Страница 17: ... 9 SAFE OPERATION ...
Страница 18: ...SAFE OPERATION 10 ...
Страница 19: ... 11 SAFE OPERATION ...
Страница 20: ...SAFE OPERATION 12 ...
Страница 21: ... 13 SAFE OPERATION ...
Страница 24: ...DEALER SERVICE 2 1 Engine serial No ...
Страница 66: ...44 EXCAVATOR OPERATION ...
Страница 114: ...92 LIFTING CAPACITY ...
Страница 115: ...93 LIFTING CAPACITY ...