11
Blower Cone Installation
Thread (1) 5/16”-18 Jam Nut P#(K0120) onto each end of (2) 5/16”-18 x 2-1/2” HHCS P#(K0125) as
shown in Figure A.
Now partially thread (1) bolt into each of the two threaded bosses located on the Blower Housing. Place
8” Blower Cone P#(E6009) so the two tabs line up with the bolts and tighten completely as shown in
Figure B.
Once the (2) bolts are tight, tighten the Jam Nuts against the threaded boss as shown in Figure C.
Refer to Figure D for proper Blower Cone installation reference.
Figure B
Threaded
Boss
Blower
Cone Tab
Figure C
(1st) Tighten
Bolt
(2nd) Tighten
Jam Nut
Figure D
Blower
Cone
Thread (1) Jam Nut
Onto Each 5/16”-18 Bolt
Figure A