background image

S0

9 10

1

L

Voltage inputs

N

L

N

2

3

4

5

6

7

8

11 12 13 14 15 16 17 18 19 20

RS485

Current inputs

WLAN GPRS

OFF

ON

PV1+

PV1-

PV2+

PV2-

PV3+

PV3-

WLAN GPRS

COM1

COM2

L1

L2

L3

N

PE

D

C I

N

P

U

AC OUTPUT

02

Meter & CT Installation:

Pull to release the retaining clip.

Mount the Meter on the DIN track and push
the retaining clip up (a clicksound indicates 
it is installed well).    

The current should be consistent with the
direction of the arrow,which is from the
grid to the inverter.

Buckle the CT in the direction of the 
arrow.

Wiring Connection:

PE

GRID

INVERTER

(LOAD)

LOAD

GRID

N

L3

L2

L1   

Ensure CT and corresponding supply cable are connected to the same phase.
Incorrect connection or direction will cause incorrect data and may damage the meter.

Correct direction of CT: Grid

Inverter.

Pin 3 

Pin 4

485A

white

black

485B

S0

9 10

1

L

Voltage inputs

N

L

N

2

3

4

5

6

7

8

11 12 13

14 15 16

17 18 19

20

RS485

Current inputs

Отзывы: