76
ENGINE
TIMING CHAIN TENSIONING RAIL INSTALLATION
1. Remove the screw (1).
2. Screw the inner screw clockwise to tighten the stretcher.
3. Install the timing chain tensioning rail in reverse order.
4. Tighten the two screws (2).
5. To activate the tensioner, screw the inner screw to the left till
the tensioner works alone.
6. Tighten the screw (1).
VALVE CLEARANCE ADJUSTMENT
1.
$GMXVWWKHSLVWRQWR¿ULQJ7'&7PDUNLQJOLQHDVGHVFULEHG
on page 77.
2.
7RDGMXVWWKHYDOYHFOHDUDQFHORRVHWKHORFNQXWDQGWXUQLQ
RURXWWKHYDOYHDGMXVWPHQWVFUHZIRUWKHUHTXHVWHGFOHDU
-
ance.
3.
$IWHUWKHVXFFHVVIXOO\VHWWLQJVNHHSWKHDGMXVWPHQWVFUHZLQ
SRVLWLRQDQG¿[WKHORFNQXW
Allowable limit: IN: 0.10 mm
EX: 0.13 mm
NOTE
For an easier processing it´s recommended to use clearance
gauges (3) as shown in the picture .
1
2
1
2
3
Содержание T58 - ZION 125
Страница 1: ...REPAIR MANUAL T58 ZION 125 Vers 2014_06...
Страница 12: ...12 SPECIAL TOOLS Thickness gauge clearance gauge Fig 1 Fig 3 Fig 5 Fig 7 Fig 2 Fig 4 Fig 6 Fig 8...
Страница 14: ...14 SPECIAL TOOLS LJ Fig 21a Fig 22a Fig 23a Fig 24 Fig 20 Fig 21b Fig 22b Fig 23b Fig 25...
Страница 15: ...15 1 PERIODIC MAINTENANCE...
Страница 34: ...34 2 REPAIR AND DIAGNOSTICS...
Страница 95: ...95 ELECTRICAL SYSTEM WIRING DIAGRAM...
Страница 136: ...KSR Moto is a trademark of KSR Group GmbH Gewerbeparkstrasse 11 3500 Krems Austria w w w k s r g r o u p c o m...