5.4 Installing the pressure booster system
WARNING
Top-heavy pressure booster system
Risk of personal injury by pressure booster system tipping over!
▷
Pressure booster systems awaiting final installation must be secured against
tipping over.
▷
Firmly anchor the pressure booster system.
Remove all packaging before installing the pressure booster system. Connect the
pressure booster system's inlet line and discharge line to the corresponding site
distribution lines.
NOTE
In order to avoid transmission of piping forces onto the pressure booster system and
transmission of solid-borne noise, we recommend installing length-limited
expansion joints.
Allow sufficient space for maintenance and repair work.
✓
All structural work required has been checked.
✓
The dimensions of the concrete foundation are correct, and the concrete has set
firmly.
1.
Mark out the anchoring holes on the floor as shown in the outline drawing
(attached to the order confirmation).
2.
Drill the holes (max. diameter: 12 mm).
3.
Insert plug fixings of appropriate size.
4.
Set the pressure booster system down in its correct installation position.
5.
Use suitable bolts to anchor the pressure booster system firmly to its
foundation.
5.5 Installing the piping
Make sure that piping is installed without transmitting any stresses or strains. The use
of length-limited expansion joints (see accessories) is recommended.
CAUTION
Air pockets in suction line
Pressure booster system cannot prime!
▷
Lay piping with a continuously rising slope (as shown).
Suction lift operation
Incorrect
Correct
Fitting the suction line
The suction line of each pump must be air-tight, as short as possible and with as few
bends as possible.
5 Installation at Site
Surpress Feu SFE.3
17 of 40
Содержание Surpress Feu SFE.3
Страница 1: ...Fire fighting System Surpress Feu SFE 3 From series 2014w33 Installation Operating Manual...
Страница 39: ......