Work on the machine / unit must be carried out only during
standstill. The shutdown procedure described in the manual
for taking the unit out of service must be adhered to without
fail.
Pumps or pump units handling fluids injurious to health must
be decontaminated.
Immediately following completion of the work, all safety-
relevant and protective devices must be re-installed and / or
re-activated.
Please observe all instructions set out in the chapter on
“Commissioning / start-up” before returning the unit to service.
2.7
Unauthorised modification and manufacture
of spare parts
Modifications or alterations of the equipment supplied are only
permitted after consultation with the manufacturer. Original
spare parts and accessories authorised by the manufacturer
ensure safety. The use of other parts can invalidate any liability
of the manufacturer for resulting damage.
2.8
Unauthorised modes of operation
The warranty relating to the operating reliability and safety of
the unit supplied is only valid if the equipment is used in
accordance with its designated use (see section 4). The limits
stated in the data sheet must not be exceeded under any
circumstances.
3
Transport and interim storage
The package unit is packaged on pallets or in wooden crates
and wrapped in plastic foil for shipping and interim storage.
All connecting points are capped. It is imperative that the
shipping / handling instructions shown on the package be
followed.
The unit must be protected against frost.
If upon unpackaging the unit you should discover that the
package has been damaged by dropping or some other form
of mechanical impact, please carefully inspect the unit itself
for possible damage and inform the freight forwarder / KSB’s
customer service, even if you have not been able to detect
any such damage.
Once the unit has been removed from the package, it must be
stored in accordance with the location and installation
instructions (see Installation and location).
4
Description
4.1
General description
The fully electronic pressure boosting package units are
supplied ready for connection.
The equipment circuitry allows both direct and indirect
connection to the water supply system.
The equipment must be operated and maintained as to
ensure uninterrupted reliability of water supply, without
causing disturbances in the public water supply or other
consumer supply systems.
Any applicable
Water utility or fire protection regulations
must be complied with.
Furthermore, local conditions must be taken into account (for
example excessive or very unsteady supply pressure requiring
the installation of a pressure reducer).
4.2
Configuration and function
4.2.1 Configuration
Between 2 and 6 vertical high-pressure pumps (for description
and function, please refer to the pump’s Operating Instruction)
are arranged on a baseplate.
Each pump is seated on its own anti-vibration mounts.
The pumps are arranged in line and connected by mild steel
pipes.
On the system side, a swing check valve and a shut-off butterfly
valve are fitted downstream of each pump.
On the suction side, a ball valve or a shut-off butterfly valve
are fitted upstream of each pump as a service valve.
The shut-off elements permit dismantling of individual pumps
without having to drain the pipework. The discharge side non-
return valve ensures that the unit remains filled with water and
prevents backflow through the pumps.
Both headers feature additional connections for draining,
venting and installation of various dry running protection
devices.
The accumulator is fitted with an isolating valve. It compensates
discharge-side peak pressures and together with the minimum
operating period, limits the pumps’ switching frequency.
moviBOOST VP units are started up as a function of pressure.
To this effect, a pressure transmitter is fitted in the discharge-
side piping.
Depending on the number and power of the pumps, the
completely wired control cabinet is either supplied mounted
on the baseplate or as a free-standing cabinet.
Only supplementary and special equipment is supplied fitted
on the unit.
Accessories such as expansion joints, tanks, accumulators,
pressure reducers etc. are supplied with the unit but are not
mounted.
The unit is driven by surface-cooled three-phase squirrel-cage
motors, 50 Hz, air-cooled, 2-pole, KSB standard motor with
main dimensions to IEC. Other motor makes after consultation
with KSB.
up to 2.2 kW 220-240 V/380-420 V,
from 3 kW 380-420 V/660-725 V
enclosure IP 55, thermal class F, up to 4 kW design V18,
from 5.5 kW design V1
4.2.2 Function
moviBOOST VP units are started as a function of pressure
and stopped as a function of demand.
Automatic mode
The pressure boosting unit consisting of 2 to 6 pumps starts
up the first pump as soon as the actual system pressure is
approx. 0.3 bar lower than the pre-set system pressure.
The pump is speed-controlled via frequency inverter as a
function of service demand. If the first pump cannot meet the
demand, this is recognised by the control system, and the
next pump available is started. While the first pump is operated
Содержание moviBOOST VP
Страница 1: ......
Страница 12: ...moviBOOST VP 7 5 2 Menu structure Main menu KSB logo actual value display 10 ...
Страница 14: ...moviBOOST VP 7 7 Parameter list 12 ...
Страница 15: ...moviBOOST VP 13 ...
Страница 16: ...moviBOOST VP 14 ...
Страница 17: ...moviBOOST VP 15 ...
Страница 18: ...moviBOOST VP 16 ...
Страница 19: ...moviBOOST VP 17 ...
Страница 23: ...moviBOOST VP 21 15 Electrical performance data ...
Страница 24: ...moviBOOST VP 16 Shutoff head 22 ...
Страница 29: ...moviBOOST VP NOTES ...
Страница 30: ......