moviBOOST VP
Sr. no.
Description
Page no.
1
General
1
2
Safety
1
2.1
Symbols used in these operating instructions
1
2.2
Personnel qualification and training
1
2.3
Non-compliance with safety instructions
1
2.4
Safety awareness
1
2.5
Safety instructions for the operator / user
1
2.6
Safety instructions for maintenance,
inspection and installation work
1
2.7
Unauthorised modification and manufacture
of spare parts
2
2.8
Unauthorised modes of operation
2
3
Transport and interim storage
2
4
Description
2
4.1
General description
2
4.2
Configuration and function
2
4.2.1
Configuration
2
4.2.2
Function
2
4.3
Dry running protection (supplementary
equipment)
3
4.4
Manual mode
3
4.5
Control cabinet
3
4.6
Flow diagram
4
5
Installation at site
5
5.1
Readiness for operation
5
5.2
Installation and location
5
5.3
Piping
5
5.4
Foundation
5
5.5
Location
5
5.6
Installing a pressure reducer
5
5.7
Location and installation of unpressurised
inlet tanks
5
5.7.1
Location
5
5.7.2
Installation
5
5.8
Valves and fittings
5
5.9
Noise characteristics
5
6
Connection to power supply
6
6.1
Electric wiring
6
6.2
Power supply cable
6
6.2.1
Sizing the power supply cable
6
6.3
Protective measures
6
6.4
EMC recommendations
6
6.5
Temperature requirements
6
6.6
Humidity requirements
6
6.7
Installation altitude
6
6.8
Pollution exposure
6
6.9
Checking the voltage
6
6.10
Logic / circuit diagrams
6
6.11
Over load relay
6
6.12
Potential equalization
6
Contents
Sr. no.
Description
Page no.
7
Commissioning / start-up
6
7.1
Preparations for commissioning / start-up
6
7.2
Test run
6
7.3
Checking the direction of rotation
7
7.4
Functional description / Automatic mode
7
7.5
Starting the unit
7
7.5.1
Function of the control panel
7
7.5.1.1
LEDs
8
7.5.1.2
Function keys
8
7.5.1.3
Navigation keys
8
7.5.1.4
Display
8
7.5.1.5
Service interface
9
7.5.2
Menu structure
10
7.5.2.1
Access levels
11
7.5.2.2
Displaying and changing parameters
11
7.6
Monitoring
11
7.7
Parameter list
12
7.8
Warnings and alerts - overview
18
7.9
Adjusting the settings
19
7.9.1
Setting the set pressure
19
7.9.2
Further settings
19
7.10
Remote-OFF connection
19
7.11
Fire alarm connection
19
7.12
Shutdown
19
8
Dismantling / reassembling the pumps
19
9
Returning to service
19
10
Maintenance
19
10.1
Operating monitoring
19
11
Work on the control cabinet
19
12
Inspection
20
13
Check list
20
14
Pre-set pressure
20
15
Electrical performance data
21
16
Shutoff head
22
17
Trouble-shooting
23
Acceptance report
24
Check list for commissioning / start-up
25
Annexure I - Environment Protection -
Product Disposal after useful life
26
Содержание moviBOOST VP
Страница 1: ......
Страница 12: ...moviBOOST VP 7 5 2 Menu structure Main menu KSB logo actual value display 10 ...
Страница 14: ...moviBOOST VP 7 7 Parameter list 12 ...
Страница 15: ...moviBOOST VP 13 ...
Страница 16: ...moviBOOST VP 14 ...
Страница 17: ...moviBOOST VP 15 ...
Страница 18: ...moviBOOST VP 16 ...
Страница 19: ...moviBOOST VP 17 ...
Страница 23: ...moviBOOST VP 21 15 Electrical performance data ...
Страница 24: ...moviBOOST VP 16 Shutoff head 22 ...
Страница 29: ...moviBOOST VP NOTES ...
Страница 30: ......