5.4 Electrical 

connection: 

The electrical connection must be carried out by a 
specialist electrician.  Applicable regulations must be 
complied with. 

Check the mains voltage available and the factory plate, and 
choose the appropriate connection. 

The technical connection conditions and the conditions 
of the local energy supply company must be observed 
when carrying out the connections. 

We strongly recommend the use of a safety circuit 
breaker for the motor and a thermistor associated to a 
trigger device. 

These instructions apply to asynchronous three-phase 
standard electric motors with a squirrel cage both in 
horizontal and vertical execution, in IP-23, IP-54 and IP-55 
protection grades, with frame sizes of between 56L and 
355S, both inclusive, with voltages of 200 to 500 V 
between phases. 

Before starting up the pump, it must be earthed or the 
base frame must be connected to an effective earthed 

point of the installation. 

5.4.1 Motor 

connection 

Whilst connecting the cables, ensure it is not possible 
for voltage to appear. 

 

Check that the earth connection is in line with local 
regulations. 

 

The coupling may produce a source of ignition or high 
temperature in the event of incorrect operation.  For 

this reason, the motor must be classified with at least the 
same type of zone and temperature as the pump. It is 
necessary to follow the instructions in the coupling manual 
which is included with the pump. 

Connection in single speed motors 

Direct start-up: 

In direct start-up the motor can be used in two different 
connections: 

The voltage and the connection, e.g. 400 VY, 240 VD is 
stamped on the motor plate. This means that the motor can 
connect at 400 volts in star connection (Y) or at 240 volts in 
delta connection (D). 

 

 

Star connection 

Delta connection 

Star-delta start-up: 

In star-delta start-up, the line voltage must coincide with the 
voltage shown on the motor for delta start up (D). The six 
terminals indicated in the following diagram will be connected: 

Connection to the star-delta contactor 

 

5.4.2 

Time relay adjustment 

In the star-delta start-up of three-phase motors, it is necessary 
to ensure that the passage from star to delta takes place 
quickly. Prolonged time will cause damage to the pump. 
Time relay adjustment in the star-delta connection: 

Motor power 

Time adjustment -Y 

 30 kW 

< 3 sec. 

> 30 kW 

< 5 sec. 

 

5.4.3 Rotation 

direction. 

Check 

Check the motor rotation direction by starting 
up and immediately shutting down.  The 

rotation direction must correspond with that shown by the 
pump arrow located on the pump casing or support.  If the 
rotation direction is not correct, any two phases L1, L2 or L3 of 
the power cable must be inverted in the motor terminal box. 

Note 

The incorrect rotation of the pump may lead to the 
incorrect operation of the seal and the heating of its 

faces. For this reason, correct rotation direction must be 
ensured using the arrow shown on the pump, with the pump 
completely filled with liquid and properly vented. 

6 Start-up 

Before starting up, both the pump and the mechanical 
seal process pipes, where appropriate, must be 

completely filled with liquid. 

It is necessary to prevent the formation of explosive 
atmosphere within the frame and the seal housing. 

Although there are interior evacuation conducts which remove 
the possibility of the air becoming blocked, it is necessary to 
fully vent the pump and its process pipes, when fitted, before 
starting up. 
Start-up shall be carried out when all the necessary 
mechanical, hydraulic, electrical and pneumatic connections 
are complete. 

Motor checks. 

When making the electrical connection, ensure the 
type of current and nominal voltage shown on the 
motor's factory plate concur with the type of current 

and the mains voltage in the place of installation. 

Follow the indications described in the motor manual. 

Содержание AU Series

Страница 1: ...ins important instructions and warnings You must read them before mounting making the electrical connections and starting up You must also comply with the instructions for the components related to this pump Please remember that this Manual must be kept close to the motor pump group ...

Страница 2: ...justment 8 5 4 3 Rotation direction Check 8 6 START UP 8 6 1 FIRST START UP 9 6 1 1 Lubricant 9 6 1 2 Filling priming of the pump 9 6 1 3 Final control 9 6 1 4 Start up 9 6 1 5 Shutdown 10 6 2 SERVICE LIMITS 10 6 2 1 Switching frequency 10 6 2 2 Temperature of the liquid to be pumped Error Marcador no definido 6 2 3 Density of the liquid to be pumped 10 6 2 4 Viscosity of the liquid to be pumped 1...

Страница 3: ...hazard if not complied with are indicated with a general hazard sign Safety instructions which may involve a hazard to people and facilities if not complied with in accordance with ISO 7000 0434 Safety instructions to prevent electrical hazards in accordance with IEC 417 5036 Safety instructions which may affect the equipment and its operation if not complied with Note The details shown directly o...

Страница 4: ...o Directive 94 9 EC Individual pieces supplied as spare parts must be originals supplied and checked by KSB ITUR 3 Transport and storage 3 1 Transport and handling The transport and handling of the equipment must be carried out using suitable means in line with the weight to be supported The weight is generally shown on the delivery note or on the factory plate if it is not and the equipment canno...

Страница 5: ...oustic pressure level of these pumps is less than 92 dB A at 1 m in any operation point within the operation range without cavitation The acoustic power is less than 105 dB A 4 5 Forces and moments permitted in the nozzles CAST IRON OR BRONZE CASING 1 SUCTION IMPULSION FORCES N MOMENTS N m FORCES N MOMENTS N m SIZE PUMP Fx Fy Fz Mx My Mz Fx Fy Fz Mx My Mz AU 1 5 AU 2 AU 3 THREADED CONNECTIONS DO N...

Страница 6: ...nstructions manual for your transport bench if you do not have one already See annex 9 20 Cementing Pour an initial layer of mortar cement into the orifices of the bolts contacting throughout the periphery with the base of the base frame Once the mortar cement has set tighten the anchor pins in a balanced manner Note Connect the suction and impulsion nozzles to the installation and proceed with an...

Страница 7: ...pe from 2 to 3 m s Speed in the suction pipe from 1 to 2 m s Exceeding the admitted stresses of the pipes may lead to leaks in the pump and to the fluid escaping Hazard of death with hot liquids The suction and impulsion nozzle covers of the pump must be removed before connecting the pipes Before starting up a new installation it is necessary to thoroughly clean the tanks pipes and accessories by ...

Страница 8: ...a start up the line voltage must coincide with the voltage shown on the motor for delta start up D The six terminals indicated in the following diagram will be connected Connection to the star delta contactor 5 4 2 Time relay adjustment In the star delta start up of three phase motors it is necessary to ensure that the passage from star to delta takes place quickly Prolonged time will cause damage...

Страница 9: ...venting plug located in the casing or open a discharge pipe vent before the check valve 4 Partially open the suction valve until the liquid overflows through the vent 5 Close the vent 6 Fully open the suction valve 7 Check the rotation direction of the pump 8 Fully open the discharge valve EQUIPMENT IN SUCTION 1 Disconnect the voltage from the motor or batteries 2 Close the discharge valve 3 Remov...

Страница 10: ...mitted operation temperature is indicated in the order and in the ATEX conformity declaration If the pump is to work at a higher temperature or you do not have the data sheet please ask KSB ITUR 6 2 3 Density of the liquid to be pumped The power absorbed by the pump increases in direct proportion to the density of the impelled liquid In order to prevent overloading in the motor pump and coupling t...

Страница 11: ...lly The bearing support temperature is less than 40ºC in order to prevent burns to the hands To do this measure the temperature with a thermocouple The absence of oil grease in the bearing support may lead to a lack of lubrication of the lip seals which will come into dry contact with the shaft This contact may lead to a high shaft temperature which might cause ignition To prevent this regularly c...

Страница 12: ...mp frame must have returned to environmental temperature The pump frame must be depressurised and emptied Comply with all safety measures in accordance with 7 1 When working on the motor also take into account the rules and instructions of the manufacturer 7 4 2 Tubular coupling guards When dismounting follow the chapters on assembly but in reverse order 7 4 3 Coupling 1 Remove the coupling guard ...

Страница 13: ...ly approved quality bearings which are supplied as original spare parts Regularly check the correct state of the protector deflector and replace in the event of deterioration 7 5 Assembly 7 5 1 Tubular coupling guards 1 Install the distancer cylinder and seal using the clamps 1 1 2 Position the side cover 2 leaving the rims 3 in the upper section 3 Join the side cover 2 with the fastening screws 4...

Страница 14: ...ow of the cover 161 Check the correct location of pieces especially the seals and impellers and tighten the impeller nuts as shown in the chart in point 7 5 6 Note Do not forget to position all the safety and protection elements such as coupling guards before starting up the equipment The pump materials have been selected in accordance with the process fluid indicated in the datasheets If this flu...

Страница 15: ...he bearings With thermocouple Quarterly 2 5 12 7 Check tightness of connecting bolts for motor base frame pump base frame cover casing support support supplement flanges casing Manually Twice a year 17 8 COMPLETE PUMP CHECK Checking and dismounting the pump See point 7 of the manual Yearly 1 3 4 6 7 9 10 12 13 14 9 Check for wear of the impeller and rings Dismount casing visual inspection Yearly 1...

Страница 16: ...ghtness x x x Impeller obstructed deteriorated or imbalanced Dismount the impeller and inspect balance or change it x x Wear rings deteriorated or incorrectly assembled Dismount the rings and change them x Counter pressure too high Increase the rotation speed If this is not possible a larger impeller or larger pump needs to be assembled Please ask x Liquid viscosity or density greater than normal ...

Страница 17: ... foot 484 Fixing washer 914 Allen screw 210 Shaft 507 Deflector protection 920 Nut 230 Impeller 523 Shaft wearing sleeve 922 Impeller nut 320 Bearing 554 Flat washer 923 Bearing nut 331 Bearing bracket 636 Grease nipple 931 Lockwasger 341 Pedestal 637 Oil filling plug 932 Circlip 350 Bearing housing 643 Oil dipstick 940 Key 360 Bearing cover 800 Motor 400 Gasket 869 Coupling fastener AU M1 10 AU M...

Страница 18: ...507 800 903 2 901 2 411 2 412 902 1 554 1 920 2 902 2 920 3 554 2 523 901 1 019 AU M50 20 AU M50 25 Sectional C 1275 940 1 903 3 412 554 2 920 2 554 3 902 4 940 2 869 554 1 920 3 902 5 901 902 1 411 1 019 920 1 135 922 903 2 411 2 900 903 1 162 920 5 101 902 2 230 161 902 3 433 920 4 210 341 914 ...

Страница 19: ... 900 412 902 1 554 920 2 320 1 210 320 2 932 940 2 135 019 901 1 230 922 AU 50 20 AU 50 25 Sectional C 1269 903 1 162 920 1 101 902 2 903 5 230 161 902 3 433 420 637 643 331 360 2 940 1 903 3 412 554 920 3 507 901 2 400 360 1 320 1 903 4 210 320 2 940 2 901 1 902 1 411 1 019 920 2 135 922 903 2 411 2 900 ...

Страница 20: ...84 920 3 400 2 902 3 554 2 902 4 360 1 523 320 1 210 183 320 2 940 2 901 2 360 2 400 3 901 3 554 1 920 6 019 902 2 901 1 920 2 161 902 5 135 230 922 AU 80 15 AU 80 22 Sectional C 1271 162 903 1 101 902 1 411 1 433 940 1 161 554 2 320 1 636 320 2 923 903 2 411 2 412 902 3 920 2 932 2 331 210 932 1 931 940 2 922 135 902 2 554 1 920 1 019 901 1 230 900 ...

Страница 21: ...40 2 922 135 902 1 554 1 920 1 019 901 230 900 AU 150 25 AU 150 35 AU 150 45 Sectional C 1272 183 902 3 230 554 3 920 3 433 507 320 1 210 920 1 554 1 902 1 400 1 101 162 019 901 1 922 940 1 554 2 920 2 902 2 411 903 1 900 135 523 161 360 1 412 903 2 914 1 350 636 400 2 320 2 360 2 940 2 420 914 2 901 2 AU 200 40A AU 200 40B AU 200 55A AU 200 55B AU 200 68A AU 200 68B ...

Страница 22: ... 1334 183 902 3 230 554 3 920 3 433 507 320 1 637 920 1 554 1 902 1 400 1 101 162 019 901 1 922 940 1 554 2 920 2 902 2 411 1 903 1 900 135 523 161 411 2 412 903 2 210 350 400 2 643 320 2 360 940 2 420 901 2 554 4 901 3 ...

Страница 23: ...n sloping and clean in order to prevent any displacement If operation is by way of an electric motor with a pluggable connection check that the circuit breaker or operation selector is in shutdown position before connecting to the grid The start up instructions in the pump and motor manuals must be followed 9 2 3 Maintenance Apart from the particular instructions on maintenance of the pump and mot...

Страница 24: ...NDER CERTIFICATION PUMPS SERIES AU EC DECLARATION OF CONFORMITY KSB ITUR hereby declares under its responsibility that its aforementioned products when supplied with a motor to which this Declaration refers are in line with European Directive 98 37 EC on the approximation laws of the Member States on machinery Applied harmonised standards EN 292 Part 1 EN 292 Part 2 and EN 809 MANUFACTURER S DECLA...

Отзывы: