background image

 
Distributor drain casing 
 
Be careful to centre the spring properly on the bushing at the bottom of the drain body (risk that it 
might catch on the notches). 
 
 
 
 
 
 
 
 
The drain plunger must be mounted in the body of the drain with food grade grease. 
Ensure that the drain body is firmly locked down on the distributor (tighten counterclockwise). 
 
Electronic boards 
Connectors on electronic boards: check that connectors are well secured by the clips. 
Check the coffee volume selector button for correct indexation (1/2 turn possible error). 
Check ground coffee cake thickness after any work on electronics or the grinder. 
 
Steam nozzle 
Be careful when replacing the O-ring as this is a delicate operation. 
 
Body 
There is a risk that switches might catch on the cake tray housing inside the body: press the body 
down firmly when replacing. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

9

Содержание XP7200 Series

Страница 1: ...2 electronic boards for o thermoblock temperature regulation o mesuring the waterflow volume by counting flowmeter pulses o 1 cup 2 cup hot water graphic model steam cleaning and scale removal cycle...

Страница 2: ...cing Facing mount mount Grinder Tamping head Control board if necessary replace board Power board Pump Flowmeter Thermoblock actuator Fuses Distributor Steam nozzle Coffee nozzle Body provides visual...

Страница 3: ...by pressing on the top nut using a socket spanner or equivalent Disassemble the switch control plate Flowmeter No particular instructions Power electronic board Electronic circuit mount maintained in...

Страница 4: ...onnect the distributor thermoblock coffee hose from the distributor Disconnect the thermoblock distributor steam hose from the thermoblock system if necessary remove the drain from the distributor aft...

Страница 5: ...be replaced Use Norma Cobra 7 5 clamps Lock the clamps with gripping pliers and check that they have been properly assembled Grinder Indexing and mounting of the grinder ring on the coffee maker are t...

Страница 6: ...embly line same as for V16 except that setting operation is carried out before the standard coffee cycle With cake tray draw and tank removed Press steam key mains connection o Blue On Off light comes...

Страница 7: ...lay 1 2 3 4 5 Time for strong coffee grinding secs 6 7 8 9 10 grinder 2 15 02 2006 Lead Respect the earthwire routing The lead earthwire must not be in contact with moving parts stainless steel corner...

Страница 8: ...When screwing be careful not to offset the tamping head mount Thermoblock and ejection scraper interface Take care when replacing the seal which must not protrude into the coffee chamber Distributor R...

Страница 9: ...ghten counterclockwise Electronic boards Connectors on electronic boards check that connectors are well secured by the clips Check the coffee volume selector button for correct indexation 1 2 turn pos...

Страница 10: ...see troubleshooting diagnosis table grinder not compliant quantity of ground coffee electronics setting not compliant with the grinder ejection ram stuck in high position cake tray replaced partially...

Страница 11: ...maximum time for the ground coffee distributor has been reached without the ground coffee proportioning switch being detected Concerns the ground coffee version 3 3 Cycle start conditions The distrib...

Страница 12: ...tank or with tank empty Water level board or bundle defective 8 8 Hot water and Coffee Pump After a certain time of pump control during coffee or water flow the circuit is considered to be blocked as...

Страница 13: ...use which led to the coffee leaking Interface tank seal Thermoblock or water circuit scaled up Remove scale Replace scaled up item if scale removal ineffective Thermoblock coffee circuit clogged up by...

Страница 14: ...circuit Volume of coffee in the cup does not comply Thermoblock or water circuit scaled up Remove scale Replace scaled up item if scale removal ineffective A few drops of water drip from the steam noz...

Страница 15: ...ad and grinder spout Insert power board with drain time extended from 8 to 10 secs V21 picto and V14 graphic Bad thermoblock drain Leakage at tamping head seal level Check that the tamping head does n...

Страница 16: ...consumption of distributor motor distributor opposing torque too high Risk of damage to the electronic power board AFTER SALES A S MODE OPERATION 1st level A S mode This mode makes it possible to acc...

Страница 17: ...Times switched on number unit 13 Operating time min ON OFF light on 14 Rinsing number unit 15 Auto cut off duration 1 2 3 4 5 hours hour 16 Water hardness scale removal frequency level 0 1 2 3 4 valu...

Страница 18: ...r No 13 Production date 14 First use date 15 Graphic software version Ref 16 Power software version Ref 17 Model grinder Model 18 Coffee function water volume ml 19 Steam function water volume ml 20 T...

Страница 19: ...19...

Страница 20: ...correct operation of switches for detecting the presence of draw cake tray and tank Correct coffee operation with measurement of cake thickness comprised between 11 and 13 mm with new grinder in 60 m...

Отзывы: