background image

 

2nd level A-S mode

 

 

This 2nd level after-sales mode enables control and testing of power items. 
 
Pictographic model (not available)

 

 
Graphic model 
Access to A-S 2 via 

OK key + coffee grounds collector r mains connection. 

Access to Controls and Actions by menus and sub-menus in the display 
Exit from sub-menus via 0/1 key. 

 

 
 

Pump 

On / Off 

 
 

(the distributor 
must be in 
actuator down 
position) 

 

Actuator down  

 
 
 
 

Distributor 

Origin 

 
 
 

Next tooth 

 
 
 

Grinder 

1 portion 

 
 
 

On / Off 

 
 
 

Heating 

Steam T° On / Off 

 

Heating 
function to be 
confirmed 

 
 

Water T° On / Off 

 
 

 
POST-SERVICING COMPLIANCY TEST

 

 

  Checking correct operation of switches for detecting the presence of draw, cake tray and tank 

  Correct coffee operation with measurement of cake thickness (comprised between 11 and 13 

mm with new grinder in 60-ml strong espresso function) 

  Correct steam operation 

  Correct hot water operation 

  Cleaning the coffee-maker for delivery 

 

GRAPHIC DISPLAY TEST 

Enables presence of all segments to be checked in the display. 
Press Prog + water + mains connection and follow carefully the order of operations: 

  0/1 key:    

 

figure 1 displayed 

  Prog key:    

 

figure 2 displayed 

  Steam key:  

 

figure 3 displayed 

  Water key: 

 

figure 4 displayed 

Turn the selection button in one direction to darken the screen 
Turn the selection button in the other direction to remove display 
Press OK: the blue light comes on 

 

20

Содержание XP7200 Series

Страница 1: ...2 electronic boards for o thermoblock temperature regulation o mesuring the waterflow volume by counting flowmeter pulses o 1 cup 2 cup hot water graphic model steam cleaning and scale removal cycle...

Страница 2: ...cing Facing mount mount Grinder Tamping head Control board if necessary replace board Power board Pump Flowmeter Thermoblock actuator Fuses Distributor Steam nozzle Coffee nozzle Body provides visual...

Страница 3: ...by pressing on the top nut using a socket spanner or equivalent Disassemble the switch control plate Flowmeter No particular instructions Power electronic board Electronic circuit mount maintained in...

Страница 4: ...onnect the distributor thermoblock coffee hose from the distributor Disconnect the thermoblock distributor steam hose from the thermoblock system if necessary remove the drain from the distributor aft...

Страница 5: ...be replaced Use Norma Cobra 7 5 clamps Lock the clamps with gripping pliers and check that they have been properly assembled Grinder Indexing and mounting of the grinder ring on the coffee maker are t...

Страница 6: ...embly line same as for V16 except that setting operation is carried out before the standard coffee cycle With cake tray draw and tank removed Press steam key mains connection o Blue On Off light comes...

Страница 7: ...lay 1 2 3 4 5 Time for strong coffee grinding secs 6 7 8 9 10 grinder 2 15 02 2006 Lead Respect the earthwire routing The lead earthwire must not be in contact with moving parts stainless steel corner...

Страница 8: ...When screwing be careful not to offset the tamping head mount Thermoblock and ejection scraper interface Take care when replacing the seal which must not protrude into the coffee chamber Distributor R...

Страница 9: ...ghten counterclockwise Electronic boards Connectors on electronic boards check that connectors are well secured by the clips Check the coffee volume selector button for correct indexation 1 2 turn pos...

Страница 10: ...see troubleshooting diagnosis table grinder not compliant quantity of ground coffee electronics setting not compliant with the grinder ejection ram stuck in high position cake tray replaced partially...

Страница 11: ...maximum time for the ground coffee distributor has been reached without the ground coffee proportioning switch being detected Concerns the ground coffee version 3 3 Cycle start conditions The distrib...

Страница 12: ...tank or with tank empty Water level board or bundle defective 8 8 Hot water and Coffee Pump After a certain time of pump control during coffee or water flow the circuit is considered to be blocked as...

Страница 13: ...use which led to the coffee leaking Interface tank seal Thermoblock or water circuit scaled up Remove scale Replace scaled up item if scale removal ineffective Thermoblock coffee circuit clogged up by...

Страница 14: ...circuit Volume of coffee in the cup does not comply Thermoblock or water circuit scaled up Remove scale Replace scaled up item if scale removal ineffective A few drops of water drip from the steam noz...

Страница 15: ...ad and grinder spout Insert power board with drain time extended from 8 to 10 secs V21 picto and V14 graphic Bad thermoblock drain Leakage at tamping head seal level Check that the tamping head does n...

Страница 16: ...consumption of distributor motor distributor opposing torque too high Risk of damage to the electronic power board AFTER SALES A S MODE OPERATION 1st level A S mode This mode makes it possible to acc...

Страница 17: ...Times switched on number unit 13 Operating time min ON OFF light on 14 Rinsing number unit 15 Auto cut off duration 1 2 3 4 5 hours hour 16 Water hardness scale removal frequency level 0 1 2 3 4 valu...

Страница 18: ...r No 13 Production date 14 First use date 15 Graphic software version Ref 16 Power software version Ref 17 Model grinder Model 18 Coffee function water volume ml 19 Steam function water volume ml 20 T...

Страница 19: ...19...

Страница 20: ...correct operation of switches for detecting the presence of draw cake tray and tank Correct coffee operation with measurement of cake thickness comprised between 11 and 13 mm with new grinder in 60 m...

Отзывы: