
GB-7
D
GB
F
NL
I
E
Maintenance
In order to ensure smooth operation: check the func-
tion and tightness of the JSAV every year, or every
six months if operated with biogas, see page 4
(Checking the function) and page 3 (Tightness
test).
▷
In the case of malfunctioning, check the measur-
ing unit and valve disc and replace if necessary.
Selecting spare parts: see free PartDetective DVD:
PartDetective, (D/GB). Replacing spare parts:
see page 5 (Replacing the measuring unit),
see page 6 (Replacing the valve disc).
▷
After carrying out maintenance work or replacing
spare parts, check for tightness and function,
see page 3 (Tightness test) and page 4
(Checking the function).
Accessories
Position switch for remote indication
The position switch can be used for electronic posi-
tion checks.
Order No.: 03151185
Part designations
1
2
3
Position switch
Aluminium turned part
Lock nut
Two washers and another lock nut which are included
in the delivery are not required.
Ensure that the JSAV is open. The red “SHUT”
mark is not visible.
2
4
3
5
7
6
8
Screw in the position switch until the switching
point is reached and then screw in a further half
a turn.
▷
See the drawing labelled “Contacts” in the en-
closed position switch installation and connec-
tion instructions for measuring the switching
point.
9
Prevent the position switch from rotating using
the fitted lock nut.
0
Wire the position switch.
▷
See the drawing labelled “Contacts” in the en-
closed position switch installation and connec-
tion instructions for the electrical wiring.
After wiring, check for correct functioning, see
page 4 (Checking the function).
Technical data
Gas type: natural gas, town gas, LPG (gaseous),
biogas (max. 0.02 %-by-vol. H
2
S) or air.
The gas must be dry in all temperature conditions
and must not contain condensate.
Max. inlet presure p
u max.
5 bar (72.5 psig).
Max. test pressure for testing the JSAV:
temporarily < 15 min. 7.5 bar (109 psig).
Max. test pressure for testing the impulse line:
temporarily < 15 min. 750 bar (10.8 psig).
Trip pressure p
do
set at the factory:
120 mbar (46.8 "WC).
Adjusting range for trip pressure p
do
, see page
4 (Replacing the spring), Spring table.
Accuracy group: AG 10.
Ambient temperature:
-15 to +60°C (5 to 140°F).
Storage temperature:
-15 to +40°C (5 to 104°F).
Connection for housing:
JSAV..F: flange to ISO 7005,
JSAV..A: ANSI flange.
Connection for impulse and breather lines:
Rp ¼ (¼ NPT).
Housing: GGG 40.
Diaphragm: NBR,
valve seat: aluminium,
valve stem: stainless steel,
valve disc: aluminium with vulcanized NBR seal.