Krom Schroder JSAV 50 Скачать руководство пользователя страница 7

GB-7

D

GB

F

NL

I

E

Maintenance

In order to ensure smooth operation: check the func-
tion and tightness of the JSAV every year, or every 
six months if operated with biogas, see page 4 
(Checking the function) and page 3 (Tightness 
test).

 

In the case of malfunctioning, check the measur-
ing unit and valve disc and replace if necessary. 
Selecting spare parts: see free PartDetective DVD:

  

www.kromschroeder.com 

 Products

 → 

DVD 

→ 

PartDetective, (D/GB). Replacing spare parts: 

see page 5 (Replacing the measuring unit), 
see page 6 (Replacing the valve disc).

 

After carrying out maintenance work or replacing 

spare parts, check for tightness and function, 
see page 3 (Tightness test) and page 4 
(Checking the function).

Accessories

Position switch for remote indication

The position switch can be used for electronic posi-

tion checks.
Order No.: 03151185

Part designations

 

  Position switch

  Aluminium turned part

  Lock nut

Two washers and another lock nut which are included 

in the delivery are not required.

  

 Ensure that the JSAV is open. The red “SHUT” 

mark is not visible.

2

4

3

5

7

6

 8 

 Screw in the position switch until the switching 

point is reached and then screw in a further half 
a turn.

 

See the drawing labelled “Contacts” in the en-
closed position switch installation and connec-
tion instructions for measuring the switching 
point.

 9 

 Prevent the position switch from rotating using 

the fitted lock nut.

 0 

 Wire the position switch.

 

See the drawing labelled “Contacts” in the en-
closed position switch installation and connec-
tion instructions for the electrical wiring.

  

 After wiring, check for correct functioning, see 

page 4 (Checking the function).

Technical data

Gas type: natural gas, town gas, LPG (gaseous), 
biogas (max. 0.02 %-by-vol. H

2

S) or air. 

The gas must be dry in all temperature conditions 

and must not contain condensate.
Max. inlet presure p

u max.

 5 bar (72.5 psig).

Max. test pressure for testing the JSAV: 
temporarily < 15 min. 7.5 bar (109 psig).
Max. test pressure for testing the impulse line: 
temporarily < 15 min. 750 bar (10.8 psig).

Trip pressure p

do

 set at the factory: 

120 mbar (46.8 "WC).

Adjusting range for trip pressure p

do

, see page 

4 (Replacing the spring), Spring table.
Accuracy group: AG 10.
Ambient temperature: 

-15 to +60°C (5 to 140°F).

Storage temperature:

-15 to +40°C (5 to 104°F).

Connection for housing: 

JSAV..F: flange to ISO 7005, 
JSAV..A: ANSI flange.

Connection for impulse and breather lines:  
Rp ¼ (¼ NPT).
Housing: GGG 40.
Diaphragm: NBR, 
valve seat: aluminium, 
valve stem: stainless steel, 
valve disc: aluminium with vulcanized NBR seal.

Содержание JSAV 50

Страница 1: ...ions may only be carried out by qualified gas technicians Electrical interventions may only be carried out by qualified electricians Conversion spare parts All technical changes are prohibited Only use OEM spare parts Changes to edition 10 15 The following chapters have been changed Installation Setting the trip pressure pdo Certification Operating instructions D GB GB 1 03250885 Translation from ...

Страница 2: ...trip pressure pdo ambient temperature see type label D 49018 Osnabrück Germany JSAV TS Pu max Who pdo AGo 10 Installation CAUTION Please observe the following to ensure that the JSAV is not damaged during installation Sealing material cuttings and other impurities must not be allowed to get into the housing We recommend installing a filter upstream of the JSAV in order to protect it against impuri...

Страница 3: ...ial Ensure that there is sufficient tube length for the impulse line 0 Rp NPT Connecting the breather line Remove the plastic plug in the breather line connection and connect an Rp NPT pipe We recommend a pipe diameter of 12 x 1 5 mm 1 Install the breather line and seal with approved sealing material Route the breather line to a safe area 0 Rp NPT Tightness test WARNING An additional tightness tes...

Страница 4: ...isc Ensure that the JSAV and outlet gas line are closed 1 Vent the system 2 Slowly open the manual valve at the inlet 3 The outlet pressure pd must not rise Setting the trip pressure pdo 1 Select the trip pressure pdo according to the outlet pressure pd of the pressure regulator 20 0 40 60 80 100 140 180 220 260 300 340 50 100 150 200 250 300 350 400 450 500 pd mbar p do mbar VSBV JSAV 2 Remove th...

Страница 5: ... reset lever until the valve disc opens and clicks into place and the SHUT mark is no longer visible The red SHUT mark must not be visible once the valve disc has clicked into place The JSAV is ready for operation Replacing the measuring unit The measuring unit has to be replaced if the JSAV no longer opens or can no longer be reset We recommend cleaning the O ring seats and lightly greasing the O...

Страница 6: ...e to the impulse line to close the valve 2 Detach the impulse and breather lines from the JSAV 7 6 4 5 3 Press the reset lever and turn until the valve disc is on top WARNING Risk of injury The spring wire is under high stress 10 11 8 12 14 13 9 15 16 Insert new O rings from the seal set Press the spring wire into the notch in the plate 17 Follow the reverse procedure when reassembling using the n...

Страница 7: ...urther half a turn See the drawing labelled Contacts in the en closed position switch installation and connec tion instructions for measuring the switching point 9 Prevent the position switch from rotating using the fitted lock nut 10 Wire the position switch See the drawing labelled Contacts in the en closed position switch installation and connec tion instructions for the electrical wiring 11 Af...

Страница 8: ... Part designa tions Report any transport damage immediately Storage Store the product in a dry and clean place Storage temperature see page 7 Technical data Storage time 6 months before using for the first time If stored for longer than this the overall service life will be reduced by the corresponding amount of extra storage time Packaging The packaging material is to be disposed of in ac cordanc...

Отзывы: