We recommend installing a manual valve AKT 25 

in the pipe leading to the safety relief valve 

VSBV 25, so that the annual function check of 

the safety shut-off valve JSAV can be carried out 
without having to remove it.

 

To prevent the VSBV from being unintentionally 

shut off, we recommend removing the manual 
valve lever after commissioning and attaching 
it to the pipe.

 _>  5DN

 JSAV

 VSBV

Connecting the impulse line

 

Remove the plastic plug in the “impulse line” con-
nection and connect an Rp ¼ (¼ NPT) pipe. We 
recommend a pipe diameter of 12 x 1.5 mm.

  

  Install the impulse line and seal with an approved 

sealing material.

 

Ensure that there is sufficient tube length for the 
impulse line.

0

Rp ¼ (¼ NPT)

Connecting the breather line

 

Remove the plastic plug in the “breather line” 
connection and connect an Rp ¼ (¼ NPT) pipe. 
We recommend a pipe diameter of 12 x 1.5 mm.

  

 Install the breather line and seal with approved 

sealing material.

 

Route the breather line to a safe area.

0

Rp ¼

(¼ NPT)

Tightness test

 WARNING

–   An additional tightness test must be carried 

out on the JSAV at all joints which have been 
opened for maintenance work or replacement 
of spare parts.

 

Ensure that the valve seat of the JSAV is open, 
see page 5 (Resetting).

  

 Block the pipeline at the inlet and outlet.

 

Note max. test pressure. 

JSAV inlet and outlet: max. 6 bar (87 psig), 

impulse line: max. 750 mbar (10.9 psig).

  

 Slowly apply test pressure.

0

p

do

p

d

N

2

 = max. 7,5 bar (109 psig)

N

2

 = max. 750 mbar

3

4

Содержание JSAV 50

Страница 1: ...ions may only be carried out by qualified gas technicians Electrical interventions may only be carried out by qualified electricians Conversion spare parts All technical changes are prohibited Only use OEM spare parts Changes to edition 10 15 The following chapters have been changed Installation Setting the trip pressure pdo Certification Operating instructions D GB GB 1 03250885 Translation from ...

Страница 2: ...trip pressure pdo ambient temperature see type label D 49018 Osnabrück Germany JSAV TS Pu max Who pdo AGo 10 Installation CAUTION Please observe the following to ensure that the JSAV is not damaged during installation Sealing material cuttings and other impurities must not be allowed to get into the housing We recommend installing a filter upstream of the JSAV in order to protect it against impuri...

Страница 3: ...ial Ensure that there is sufficient tube length for the impulse line 0 Rp NPT Connecting the breather line Remove the plastic plug in the breather line connection and connect an Rp NPT pipe We recommend a pipe diameter of 12 x 1 5 mm 1 Install the breather line and seal with approved sealing material Route the breather line to a safe area 0 Rp NPT Tightness test WARNING An additional tightness tes...

Страница 4: ...isc Ensure that the JSAV and outlet gas line are closed 1 Vent the system 2 Slowly open the manual valve at the inlet 3 The outlet pressure pd must not rise Setting the trip pressure pdo 1 Select the trip pressure pdo according to the outlet pressure pd of the pressure regulator 20 0 40 60 80 100 140 180 220 260 300 340 50 100 150 200 250 300 350 400 450 500 pd mbar p do mbar VSBV JSAV 2 Remove th...

Страница 5: ... reset lever until the valve disc opens and clicks into place and the SHUT mark is no longer visible The red SHUT mark must not be visible once the valve disc has clicked into place The JSAV is ready for operation Replacing the measuring unit The measuring unit has to be replaced if the JSAV no longer opens or can no longer be reset We recommend cleaning the O ring seats and lightly greasing the O...

Страница 6: ...e to the impulse line to close the valve 2 Detach the impulse and breather lines from the JSAV 7 6 4 5 3 Press the reset lever and turn until the valve disc is on top WARNING Risk of injury The spring wire is under high stress 10 11 8 12 14 13 9 15 16 Insert new O rings from the seal set Press the spring wire into the notch in the plate 17 Follow the reverse procedure when reassembling using the n...

Страница 7: ...urther half a turn See the drawing labelled Contacts in the en closed position switch installation and connec tion instructions for measuring the switching point 9 Prevent the position switch from rotating using the fitted lock nut 10 Wire the position switch See the drawing labelled Contacts in the en closed position switch installation and connec tion instructions for the electrical wiring 11 Af...

Страница 8: ... Part designa tions Report any transport damage immediately Storage Store the product in a dry and clean place Storage temperature see page 7 Technical data Storage time 6 months before using for the first time If stored for longer than this the overall service life will be reduced by the corresponding amount of extra storage time Packaging The packaging material is to be disposed of in ac cordanc...

Отзывы: