background image

Designation MDH 
Type 50l 

 

Dokumentation 

DOK-315-GB.doc 

Order-No. 200-0157 

 

 

 

 

 

 

Before opening a pressure con-
tainer, the compressed air feed 
must always be shut off and the 
container rendered pressureless 
via the venting valve! 

Stirring mechanisms must be 
switched off and secured against 
accidental switch-on! 

 

Rooms in which hazardous substances 
are stored or processed must have 
adequate ventilation. It may be neces-
sary to install a ventilation system. 

If the ventilation system fails, work 
must be stopped immediately and the 
stirrer switched off. 

Always comply with the relevant na-
tional and regional regulations. 

 

 

Please always read and observe 
the safety and treatment instruc-
tions of the material manufacturer – 
in particular instructions relating 
to:  

 

the wearing of protective 
equipment during the use 
of hazardous substances 

 

the avoidance of harmful or 
explosive environments 

 

 

Do not store any flammable sub-
stances, empty coating substance con-
tainers or other materials that have 
been in contact with the coating sub-
stance (paper, cloths etc.) in the con-
tainer or in the working zone. 

 

 

Do not use halogenated detergents. 
Chemical reactions may cause explo-
sive and caustic compounds! 

 

 

Electrostatic charges during opera-
tion of the pressure container can 
lead to electric shocks and spark 
formation. 
The pressure container must there-
fore be earthed!  
Air lines, material pipes and con-
tainers, equipment and electrically 
conductive surfaces in the working 
zones must also be earthed.

 

 

In the working zone, avoid open flames 
and red-hot components as well as 
equipment, tools and parts that can 
create ignitable sparks. 

 

Hang up “No Smoking” signs in a 5-
metre radius of the container. Make fire 
extinguishers available if these are not 
already in place! 

 

 

Components connected by the op-
erator (hoses and pipes, fittings, 
extraction devices etc.) must be re-
liably able to withstand the loads to 
be expected during operation of the 
pressure container (pressure, tem-
perature, chemical and mechanical 
influences). 

Before each operating step, check 
hoses and pipes for possible dam-
age and ensure that they are firmly 
connected. Loose, pressurised 
hoses may cause accidents due to 
whiplash-like movement and the 
uncontrolled discharge of fluids. 

 

Comply with all national and regional 
water protection regulations! 

Comply with all national and regional 
waste disposal regulations! 

 

 

Содержание 200-0157

Страница 1: ...Operating instructions Pressure container 50 litre capacity for operating pressures of 2 5 and 6 bar Doc 315 Rev 0...

Страница 2: ...stir rers level gauges filling devices and other accessories Krautzberger 50 litre and 100 litre pressure containers are designed for 10 000 stress reversals 1 stress reversal or load cycle is equival...

Страница 3: ...rking zone Do not use halogenated detergents Chemical reactions may cause explo sive and caustic compounds Electrostatic charges during opera tion of the pressure container can lead to electric shocks...

Страница 4: ...ional 8 Ball cock for venting 9 Material return optional 10 Sound dampener or connection option for waste air line 11 Safety valve The material extraction point 4 can be located the bottom or routed t...

Страница 5: ...y must be dry and oil free Make the necessary provision for a suitable shutoff device ball cock The compressed air fitting can be equipped with more than one if necessary adjustable outlet for the con...

Страница 6: ...fore you begin operating the system Before opening the pressure container check the cover gasket for soiling wear and damage Before opening a pressure container for all maintenance servicing and clean...

Страница 7: ...over gas ket soiled or porous Clean or replace Leakage at compressed air fit ting Gaskets defective Replace gaskets Leakage at stirrer mounting Gasket defective Replace gaskets Leakage at material out...

Страница 8: ...Designation MDH Type 50l Dokumentation DOK 315 GB doc Order No 200 0157 10 Dimensions Je nach R hrwerk 760 310 470 550 390 765 650 8...

Страница 9: ...LEMENTATION EG Druckger terichtlinie 97 23 EWG EG Niederspannungs Richtlinie 73 23 EWG nur bei elektri schen Anbauteilen EG EMV Richtlinie 93 68 EWG nur bei elektrischen Anbauteilen EG Maschinenrichtl...

Страница 10: ...bstances used and the outcome of previous inspections However the following periods may not be exceeded Internal inspection every 5 years Pressure testing every 10 years External inspection every 2 ye...

Страница 11: ...Designation MDH Type 50l Dokumentation DOK 315 GB doc Order No 200 0157 11 first periodic inspection next periodic inspection Installation test...

Страница 12: ...Designation MDH Type 50l Dokumentation DOK 315 GB doc Order No 200 0157 next periodic inspection next periodic inspection 12...

Страница 13: ...Designation MDH Type 50l Dokumentation DOK 315 GB doc Order No 200 0157 next periodic inspection next periodic inspection 13...

Страница 14: ...Designation MDH Type 50l Dokumentation DOK 315 GB doc Order No 200 0157 next periodic inspection next periodic inspection 14...

Страница 15: ...Designation MDH Type 50l Dokumentation DOK 315 GB doc Order No 200 0157 next periodic inspection next periodic inspection 15...

Отзывы: