53
Kränzle therm CA ________
Steam phase checked
Chemical valve checked
Start/Stop automatic and
re-run delay checked
Fuel shortage switch checked
Thermostat function checked
Burner function checked
Water inlet temperature
Water temperature reached
Fuel pressure
Measured smoke spot number
5
6
7
8
9
10
12
11
13 14 15
70 72 74 76 78 80
84
82
86 88 90
9 9,5 10 10,5 11 11,5
12,5
12
13 13,5 14
0
1
2
3
Result of flue gas analysis
°C
°C
bar
Safety equipment sealed with lacquer
The appliance fulfills all requirements
according to this inspection sheet
Name of inspector
.............................................................
Date
.............................................................
Signature
.............................................................
Содержание 11/130
Страница 30: ...30 Complete Assembly...
Страница 32: ...32 Electronics switchbox...
Страница 36: ...36 Combustion chamber...
Страница 38: ...38 Combustion chamber...
Страница 44: ...44 Valve housing...
Страница 48: ...48 Hose drum Special accessory Upgrade kit 44 152 2...
Страница 56: ...Reprint only allowed with the authorization of As date of 15 04 2009 Order No 30 702 1 R...