background image

B2a x2

C2a  x2

B2b x2

C2b x2

page 6 

Parts Required:

Step 3

   

Put 7 hooks into each slot of sidewall track (Part B2a & Part B2b)

Q    x104

B2a

 

/

 

B2b

X7

X 7

X

X

6

6

C2a

 

/

 

C2b

B2a

C2a

B2b

C2b

   

Put 6 hooks into each slot of sidewall track (Part C2a & Part C2b)

X2

X2

Tip:

Содержание KMAHG1012

Страница 1: ...Assembly Manual ...

Страница 2: ...need touse a drill 2 You will need one or more stepladders 5 Use the hex keys in the box 2 1 Two or more people are required for assembly 7 Do not fully tighten screws prior to complete assembly 10x12 ANCHOR BLUEPRINT 361cm 11 8 15cm 5 9 30x30cm 11 8 x11 8 296cm 9 7 266cm 8 7 331cm 10 8 9 Lay every part on soft surface to avoid any scratches ...

Страница 3: ...DESCRIPTION Pole 4 2 2 2 2 2 2 2 2 4 4 4 2 2 2 2 4 1 1 4 4 4 2 2 Beam Beam Sidewall Track Sidewall Track Sidewall Track Sidewall Track Corner Roof Bar Beam Roof Bar Union Bar Joint Bar Joint Bar Joint Bar Joint Bar Outside Roof Connector Inside Roof Connector Solidifying Bar Solidifying Bar Solidifying Bar Solidifying Bar Finishing Bar Finishing Bar Beam QTY K1 x1 L1 x4 L2 x4 F3 x2 F4 x2 ...

Страница 4: ... Corner Cover Finishing Bar Joint Cover Metal Bracket Metal Bracket Net Frame Net Frame Hook Roof Panel Roof Panel Roof Panel Roof Panel Roof Panel Roof Panel Roof Panel Roof Panel Roof Panel Roof Panel Roof Panel Roof Panel Roof Panel Roof Panel M1 x4 M2 x8 M3 x4 N x2 N1 x2 N6 x2 N7 x2 R1 x2 W x4 W1 x4 R x56 2 M5 x88 5 M4 x4 N2 x2 N4 x2 P3 x2 P4 x2 P2 x2 P5 x2 P x2 P1 x2 N5 x2 R2 x2 ZS2 x2 ZS1 x2...

Страница 5: ... 42 M6 47 M6 15 M6 10 M6 23 M6 23 2 1 1 1 Roof Panel Roof Panel Roof Panel Roof Panel Roof Panel Screws Screws Screws Screws Screws Screws Screws Hook Screws Allen key Wrench Silicone Sealant Roof Panel S x 12 2 X x16 2 X1 x8 2 Y x24 5 O x2 O1 x2 O2 x2 O4 x2 W2 x1 Z x1 O3 x2 T x 64 7 U x 21 3 V x 220 10 O5 x2 Wa x2 18 x1 ...

Страница 6: ...A x4 M1 x4 V x12 A M1 A M1 V V V page 4 Parts Required Step 1 Set up poles Part A with stand plates Part M1 using screws V as shown in diagram X4 ...

Страница 7: ...B x2 D x4 Connect Part B1 and Part B into one beam using union bar Part D with screws V Connect Part C and Part C1 into one beam using union bar Part D with screws V Parts Required Step 2 D D B B C C B1 B1 C1 C1 V V X2 X2 X2 X2 Tip ...

Страница 8: ...2b x2 page 6 Parts Required Step 3 Put 7 hooks into each slot of sidewall track Part B2a Part B2b Q x104 B2a B2b X7 X7 X X 6 6 C2a C2b B2a C2a B2b C2b Put 6 hooks into each slot of sidewall track Part C2a Part C2b X2 X2 Tip ...

Страница 9: ...b to the finished beam Part B1 Part B using screws V as shown in diagram Replicate the same steps for parts C2a C2b attaching them to the finished beam C1 C using screws V Attach parts F1 F2 to finished beam B1 B using screws V Attach parts F3 F4 to finished beam C1 C using screws V Parts Required Step 4 F1 F2 F3 F4 B2a B2b C2a C2b Tip ...

Страница 10: ...U U U x16 X X X x16 A A A A C1 C C C1 B B1 B B1 page 8 Step 5 Parts Required Use screws U X to connect poles and beams together as shown in diagram X4 X4 Tip At least two people since this step 2 ...

Страница 11: ...the frame with corner solidifying bars Parts L1 L2 using screws V as shown in diagram Step 6 Please measure diagonally from corner to corner If your structure is square those two measurements will be the same distance If they re not then do a little shifting until they measure the same Tip X4 ...

Страница 12: ...V Y Y Y Y W x4 x24 W1 page 10 Parts Required Step 7 Finish connecting beams using corner covers Part W and screws Y as shown in diagram Affix middle beams using joint cover Part W1 and screws Y and V as shown in diagram X4 X4 ...

Страница 13: ...C C1 B B1 page 11 Parts Required with silicone rubber to seal after finishing the assembly it will be better for no water leaking in heavy rain Reminder X4 18 X1 ...

Страница 14: ...frame Connect the inside roof connect Part K1 with the corner roof bar Part E using screws V Attach corner roof bar Part E to main frame using screw V as shown in diagram Attach finishing bar Part R1 R2 with Finish End Part M2 using screws V to corner roof bar Part E as shown in diagram E E E E K1 V E K1 E K1 V M2 R1 R2 ...

Страница 15: ...1 E1 E1 ZS2 ZS1 ZS1 ZS1 ZS2 ZS2 V V V V V V Attach roof bar Part E1 to inside roof connector using screws V Attach net frames Part ZS1 ZS2 to finishing bars Part R1 R2 using screws V as shown in diagram Step 9 Attach roof bar Part E1 to main frame using screw V as shown in diagram Upward View ...

Страница 16: ...page 14 Parts Required K1 x1 Wa x2 U x1 K K K1 U Wa Wa Step 10 Connect outside roof connctor Part K to inside roof Part K1 using screw U Wa as shown in diagram K K1 U Wa ...

Страница 17: ...Wearing protective gloves is recommended X16 page 15 Parts Required Step 11 Cover metal bracket Part D1 R to roof panels as shown in diagram P P1 P2 P3 P4 P5 D1 R R D1 P P1 P2 P3 P4 P5 Tip ...

Страница 18: ... J P P1 P2 P3 P4 P5 M2 V P P1 P2 P3 P4 P5 V V P P1 J1 V P2 P3 P4 P5 J V M2 V M2 M2 M2 Step 12 Push the roof panels Part P P1 P2 P3 P4 P5 to upper roof as shown in diagram Attach finishing bars Part J1 J to upper roof with finish end Part M2 using screws V as shown in diagram V M2 J J1 J J1 E ...

Страница 19: ...ing bars to roof corner bar using iron angle Part M4 and screw V as shown in diagram Affix solidifying bars Part H or I together to roof bar using iron angle Part M3 and screws V as shown in diagram V x24 H x4 I x4 M4 x4 M3 x4 I I I I H H H H M4 M3 V V ...

Страница 20: ...x2 O x2 O1 x2 O2 x2 O3 x2 O4 x2 O5 x2 N1 x2 N2 x2 N3 x2 N4 x2 N5 x2 N6 x2 N7 x2 R D1 N N1 N2 N3 N4 N5 N6 N7 O O1 O2 O3 O4 O5 Step 14 Cover metal bracket Part D1 R to roof panels as shown in diagram Wearing protective gloves is recommended Tip ...

Страница 21: ...O2 O3 O4 O5 N N1 N2 N3 N4 N5 N6 N7 O O1 O2 O3 O4 O5 N N1 N2 N3 N4 N5 N6 N7 Overall roof assembly Connect roof as below Please put the panels on the frame anti clockwisely Wearing protective gloves is recommended Tip ...

Страница 22: ...uired Step 15 Affix roof panels using screws and spacers Part M5 as shown in diagram Attention Put on one roof panel and fasten it accordingly before attaching second roof panel T x64 X1 x8 S x12 U x4 M5 x88 U M5 M5 X1 S T M5 M5 X4 X8 X64 X12 ...

Страница 23: ...sidewalls and solid sidewalls as shown in diagram Net x4 Curtain x4 x4 Net Net Curtain Curtain 1 2 10 3 4 11 5 6 12 7 8 9 13 12 10 302 cm 203 cm X4 1 X4 2 Secure curtain and netting In the end Check all screws are fixed tightly before using Attention ...

Отзывы: