72
Platinum Bio ecoMAX 860P
User Manual – EN 03.17
Leader in pellet boilers
13. Installing controller
13.5 IP protection rating
Main module enclosure provides different protection ratings depending on the
mounting method used. The module installed at the front of the enclosure pro-
vides IP20 protection rating (see data plate). The enclosure at the terminal side
provides IP00 protection rating and thus the main module terminals must be
enclosed to prevent access to this side of the enclosure. To access the terminals,
disconnect mains supply, make sure no voltage is present at the terminals and
at the cables and remove the main module enclosure.
13.6 Wiring
The controller requires 230 V~, 50 Hz power supply.
•
Use three-conductor cables (with protective conductor).
•
Follow relevant regulations.
NOTE: DANGEROUS VOLTAGE MAY BE PRESENT AT THE CONTROLLER
TERMINALS AFTER SWITCHING THE CONTROLLER OFF USING THE
KEYPAD. DISCONNECT MAINS SUPPLY AND MAKE SURE NO
VOLTAGE IS PRESENT AT THE TERMINALS AND AT THE CABLES
BEFORE INSTALLATION.
Connection cables must not contact any surfaces with temperature higher than
nominal operating temperature of the cables.
Terminals 1-21 are used for connecting devices which require 230V~ mains
supply Terminals 22–49 are used for connecting low voltage devices (up to 12 V).
CONNECTION CABLES MUST NOT CONTACT ANY SURFACES WITH
TEMPERATURE HIGHER THAN NOMINAL OPERATING TEMPERATURE
OF THE CABLES. TERMINALS 1-21 ARE USED FOR CONNECTING DEVICES
\WHICH REQUIRE 230V~ MAINS SUPPLY. TERMINALS 22–49 ARE
USED FOR CONNECTING LOW VOLTAGE DEVICES (UP TO 12 V).
The ends of the connected cables, in particular power cables, must be secured
against separation with insulating sleeves.
Power cable must be connected to the terminals marked with arrow.
ANY EXTERNAL DEVICES INCLUDING PUMPS, ACTUATORS, RELAYS
AND ANY HEATING DEVICES MUST BE CONNECTED BY AUTHORIZED
PERSON IN ACCORDANCE WITH RELEVANT REGULATIONS.
FOLLOW SAFETY REGULATIONS TO AVOID RISK OF ELECTRIC SHOCK.
CONTROLLER MUST BE FITTED WITH A SET OF PINS CONNECTED
TO THE TERMINALS SUPPLYING DEVICES WITH 230V~.
The protective conductor of the power cable should be connected to a zero line
terminal block coupled with a metal enclosure. The zero line terminal block
should be connected to the controller terminal marked with
symbol and protective conductor terminals of the devices
connected to the controller.
Module mounting: a - in a modular enclosure with front panel access, b - in an enclosure without front panel access, 1 -
main module, 2 - DIN TS35 rail, 3 - catch.
Содержание Platinum Bio ecoMAX860P3-O TOUCH (VG)
Страница 1: ...Platinum Bio ecoMAX860P3 OTOUCH VG USER MANUAL RU EN...
Страница 2: ......
Страница 3: ...RU EN USER MANUAL 5 49...
Страница 4: ......
Страница 5: ...Platinum Bio ecoMAX860P3 OTOUCH VG R U...
Страница 6: ......
Страница 7: ......
Страница 8: ......
Страница 9: ......
Страница 10: ......
Страница 11: ......
Страница 12: ......
Страница 13: ......
Страница 14: ......
Страница 15: ......
Страница 16: ......
Страница 17: ......
Страница 18: ......
Страница 19: ......
Страница 20: ......
Страница 21: ......
Страница 22: ...Platinum Bio ecoMAX860P3 OTOUCH VG...
Страница 23: ......
Страница 24: ......
Страница 25: ......
Страница 26: ......
Страница 27: ......
Страница 28: ......
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 32: ......
Страница 33: ......
Страница 34: ......
Страница 35: ...5...
Страница 36: ......
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ......
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ...Leader in pellet boilers Platinum Bio ecoMAX860P3 O TOUCH VG controller User Manual E N G L I S H E N...
Страница 50: ...50 Platinum Bio ecoMAX 860P User Manual EN 03 17 Leader in pellet boilers...
Страница 52: ...52 Platinum Bio ecoMAX 860P User Manual EN 03 17 Leader in pellet boilers...
Страница 65: ...Leader in pellet boilers Platinum Bio ecoMAX860P3 O TOUCH VG controller SERVICE manual E N G L I S H E N...
Страница 91: ...91 Platinum Bio ecoMAX 860P User Manual EN 03 17 Leader in pellet boilers Notes...
Страница 92: ...92 Platinum Bio ecoMAX 860P User Manual EN 03 17 Leader in pellet boilers Notes...
Страница 93: ...93 Platinum Bio ecoMAX 860P User Manual EN 03 17 Leader in pellet boilers...
Страница 94: ......