background image

6

Connection of external appliances 

 

[3]  -  RT- Room Thermostat contacts entries

 

[4]  -  Pump- Circulating Pump entry

 

[5]  -  LED- Room Thermostat on, signal

 

[6]  -  Pump LED - Pump on, signal

 

[7]  -  Set up switches

 

a)  - 

Pump mode

 working mode of the pump

 

b)  -  JP3 unused

 

c)  -  JP4 unused

 

[8]  -  front panel connection

 

[9]  -  Water - water in boiler signal

7

5

8

9

There is a boiler controller to which a number of external appliances can be connected 

and the controller working modes can be set. Additionally, it signals some modes that  

help to the initial start up and checking correct operation of the boiler. 

1.

  A room thermostat 

should be connected to the boiler through the RT [3] entries. 

When the connections are opened, the boiler will recognise that the required 

temperature in the room is reached. In this case the boiler will switch the heating 

off. LED [5] on the controller board signalises the room thermostat status. The 

[5] LED indicator illuminates when the thermostat connections are closed.

2.

  Pump. 

Use the [4] entries to connect a pump. The pump is powered by the fuse 

(1A delayed 230V) that is situated on the controller board with the use of con-

nector. When the pump is running, the LED indicator [6] is also is illuminated. 

3.

  Choosing the pump mode. 

There are set up switches on the control board to 

control the operating mode of the pump. Setting the switch to „ON” position chang-

ing the pump mode to constant work, despite the status of the room temperature 

connected to RT entry [3]. If the set up switch is in different position, the pump will 

operate in an automatic mode (i.e when the room temperature reaches the set 

limit of the room thermostat, the pump will be turned off – RT connection closed).

Содержание EKCO.A1

Страница 1: ...ELECTRIC CENTRAL HEATING FLOW BOILER EKCO A1...

Страница 2: ...for recycling Appropriate utilisation of used product prevents potential negative environmental influences that may occur as a result of inappropriate handling of waste In order to get more detailed...

Страница 3: ...must be performed when the power and water supply is cut off 9 Electric installation should be equipped with residual current protective devices and other solutions which will ensure disconnecting th...

Страница 4: ...Connect a boiler to the electric mains Boilers of 4 and 6kW are factory pre set to work as single phase boilers If you intend to connect a boiler to the three phase electrical sys tem take off the wi...

Страница 5: ...boiler inlet The filter must be installed in horizontal position accordingly to flow direction see arrow on the filter body with the magnetic insert chamber to the bottom Connection to the three phas...

Страница 6: ...re in the room is reached In this case the boiler will switch the heating off LED 5 on the controller board signalises the room thermostat status The 5 LED indicator illuminates when the thermostat co...

Страница 7: ...ition 8 Connect the room thermostat and set the pump mode according to Connection of external appliances 9 Turn the boiler on Front control panel operation Control panel is located on the outside boil...

Страница 8: ...t sends heating signal light off light off light off light on A failure no water in the boiler light off flashing light off light on A failure of the temperature sensor If you can start the boiler up...

Страница 9: ...Voltage 400V 3N Rated current A 3 x 17 3 3 x 21 7 3 x 26 0 3 x 30 3 Fuse rated current A 20 25 32 40 Min connecting wires section mm2 5 x 2 5 5 x 4 Max connecting wires section mm2 5 x 16 Rated power...

Страница 10: ...10...

Страница 11: ......

Страница 12: ...KOSPEL S A ul Olchowa 1 75 136 Koszalin tel 48 94 346 38 08 info kospel pl www kospel pl...

Отзывы: