background image

5

GB-0

Central heating installation diagram  

 

PI  -  manometer 

 

ZK  -  cut-off valve 

 

F  -  magnetic filter 

 

RW  -  expansion pipe 

 

NW  -  expansion vessel 

 

ZT  -  thermostatic valve 

 

ZP  -  passage valve 

 

G  -  radiator 

 

RTP  -  room thermostat 

 

ZU  -  differential pressure relief valve 

(bypass) 

 

PO  -  circulating pump 

A magnetic filter must be installed on return pipe of central heating 

installation system (before boiler inlet). The filter must be installed 

in horizontal position, accordingly to flow direction (see arrow on 

the filter body), with the magnetic insert chamber to the bottom. 

Connection to the three phase system. 

 

PNL  -  points of neutral and protective conductor 

connection 

 

PF  -  points of phase conductors connection.

 

[1]  -  temperature limiter (for 4, 6kW boilers, take 

off the [2] wire set)

Connection to the single phase system 

 

PNL  -  connection points of neutral, protective and 

phase conductor 

 

[1]  -  temperature limiter 

 

[2]  -  additional  conductor  (for  single  phase 

system only)

L    N

1

L    N

1

2

Содержание EKCO.A1

Страница 1: ...ELECTRIC CENTRAL HEATING FLOW BOILER EKCO A1...

Страница 2: ...for recycling Appropriate utilisation of used product prevents potential negative environmental influences that may occur as a result of inappropriate handling of waste In order to get more detailed...

Страница 3: ...must be performed when the power and water supply is cut off 9 Electric installation should be equipped with residual current protective devices and other solutions which will ensure disconnecting th...

Страница 4: ...Connect a boiler to the electric mains Boilers of 4 and 6kW are factory pre set to work as single phase boilers If you intend to connect a boiler to the three phase electrical sys tem take off the wi...

Страница 5: ...boiler inlet The filter must be installed in horizontal position accordingly to flow direction see arrow on the filter body with the magnetic insert chamber to the bottom Connection to the three phas...

Страница 6: ...re in the room is reached In this case the boiler will switch the heating off LED 5 on the controller board signalises the room thermostat status The 5 LED indicator illuminates when the thermostat co...

Страница 7: ...ition 8 Connect the room thermostat and set the pump mode according to Connection of external appliances 9 Turn the boiler on Front control panel operation Control panel is located on the outside boil...

Страница 8: ...t sends heating signal light off light off light off light on A failure no water in the boiler light off flashing light off light on A failure of the temperature sensor If you can start the boiler up...

Страница 9: ...Voltage 400V 3N Rated current A 3 x 17 3 3 x 21 7 3 x 26 0 3 x 30 3 Fuse rated current A 20 25 32 40 Min connecting wires section mm2 5 x 2 5 5 x 4 Max connecting wires section mm2 5 x 16 Rated power...

Страница 10: ...10...

Страница 11: ......

Страница 12: ...KOSPEL S A ul Olchowa 1 75 136 Koszalin tel 48 94 346 38 08 info kospel pl www kospel pl...

Отзывы: