background image

4

Installation 

1.  In order to take off the front cover, 

undo the fixing screws and discon-

nect the protective wire. For fixing the 

unit permanently leave free space at 

the top and bottom for access tool to 

unscrew the screws.

2.  Hang the boiler up in a vertical posi-

tion on fixing screws with the inlet and 

outlet pipes to the bottom. 

3.  Connect the boiler to a central heat-

ing  system  equipped  with  cut-off 

valves. 

4.  Fill the central heating system with 

a  treated  water  that  substantially 

extends  the  life  of  the  heating  ele-

ments.  

5.  Vent the wet central heating system. 

6.  Connect a boiler to the electric mains. 

Boilers of 4 and 6kW are factory pre-

set to work as single phase boilers. If 

you intend to connect a boiler to the 

three-phase electrical sys tem, take 

off the wire set [2].

7.  Fix the room thermostat, in accord-

ance with its manual. 

8.  Connect  the  room  thermostat  (by 

using two wires 2 x 0,35 mm

2

) to the  

(RT  entry)  on  controller.  In  order 

to  insert  the  wires  to  the  clamps, 

you have to press the switch on the 

connecting element with a use of a 

screwdriver. 

9.  Once  you  have  finished  the  above 

procedures, you can start the boiler 

according to „start-up” section.

!

       

Make sure that the room thermostat connection is a voltage free one! 

The RT connection is a voltage free connection! Connecting voltage will destroy 

the controller. 

M4x8

 

M4x8

 

C

D

C

Содержание EKCO.A1

Страница 1: ...ELECTRIC CENTRAL HEATING FLOW BOILER EKCO A1...

Страница 2: ...for recycling Appropriate utilisation of used product prevents potential negative environmental influences that may occur as a result of inappropriate handling of waste In order to get more detailed...

Страница 3: ...must be performed when the power and water supply is cut off 9 Electric installation should be equipped with residual current protective devices and other solutions which will ensure disconnecting th...

Страница 4: ...Connect a boiler to the electric mains Boilers of 4 and 6kW are factory pre set to work as single phase boilers If you intend to connect a boiler to the three phase electrical sys tem take off the wi...

Страница 5: ...boiler inlet The filter must be installed in horizontal position accordingly to flow direction see arrow on the filter body with the magnetic insert chamber to the bottom Connection to the three phas...

Страница 6: ...re in the room is reached In this case the boiler will switch the heating off LED 5 on the controller board signalises the room thermostat status The 5 LED indicator illuminates when the thermostat co...

Страница 7: ...ition 8 Connect the room thermostat and set the pump mode according to Connection of external appliances 9 Turn the boiler on Front control panel operation Control panel is located on the outside boil...

Страница 8: ...t sends heating signal light off light off light off light on A failure no water in the boiler light off flashing light off light on A failure of the temperature sensor If you can start the boiler up...

Страница 9: ...Voltage 400V 3N Rated current A 3 x 17 3 3 x 21 7 3 x 26 0 3 x 30 3 Fuse rated current A 20 25 32 40 Min connecting wires section mm2 5 x 2 5 5 x 4 Max connecting wires section mm2 5 x 16 Rated power...

Страница 10: ...10...

Страница 11: ......

Страница 12: ...KOSPEL S A ul Olchowa 1 75 136 Koszalin tel 48 94 346 38 08 info kospel pl www kospel pl...

Отзывы: