6.
Install the flat bar on the bottom chimney first, then on the wall. You can carry out
this step provisionally to mark the drillings of the wall mounting and drill the relevant
holes.
Wall
Chimne
y
Chimney
7.
Place the top and bottom chimney on the hood and fix the bottom one on it (look at
the drawing connect chimney to hood).
8.
Fix the chimney-installation bracket below the ceiling on the wall using the screws
and dowels.
Screw chimney ↔
bracket
Screw chimney ↔
bracket
9.
Lay the exhaust hose to the wall
outlet. Fix the exhaust hose with the
cable tie (1) on the wall-outlet.
10.
Fix the top chimney on the installation bracket ( look also on step 8).
11.
Insert the grease filters and connect the appliance to the mains
3
.
Check the correct position of the hood from front and side perspective. Otherwise
the appliance will not work properly.
Carbon filter
3
If the socket is covered by the chimney, you must plug in the appliance at an earlier
point in
time.
26
Содержание KH-M-60KH
Страница 34: ...34 ...
Страница 35: ...A Technische Zeichnung technical drawing dessin technique 35 ...