OPERATION MANUAL 23
SERVICE AND MAINTENANCE
1. Put the DEV rack first, and then FIX/WASH
rack.
2. When re-installing each rack, make sure to
set the rack rib properly into its groove.
• Re-install the DEV rack slowly and carefully.
• Re-install the FIX/WASH rack slowly and carefully.
1. Be careful not to splash the solution over the
film entrance sensor when you clean the
processing tank. Should the solution contact
with the film entrance sensor, thoroughly
wipe it out.
2. Use a splash guard(optional equipment) to
prevent the splash of the solution.(See page
27 as to instruction for use)
(3)Cleaning the Area Around the Processing Tanks
q
Scrub the area clean with a wet sponge (or clean
cloth) dipped in warm water(under 104
<
)
(4)Cleaning Inside the Processing Tanks
q
Pour a small amount of water into each tank and
scrub it clean with a sponge (or clean cloth).
Add more water for rinsing.
w
Open the drainage valve and empty each tank
thoroughly.
(5)Supply of the Chemical Solution
q
Remove the top cover.
w
Open the DEV and FIX drainage valves to empty
the tanks.
e
After the tanks are empty, close the valves.
™
DEV Rack
™
Groove
™
Rack Rib
™
FIX/WASH Rack
™
Rack Rib
™
Groove
™
Fixer Drainage Valve
™
Developer Drainage Valve
HINTS FOR RACK RE-INSTALLATION:
HINT: