Pit access

See 

AM-01.03.010, Safe working in elevator shaft and machine room areas

.

Safe access to all work areas

See 

AM-01.03.010, Safe working in elevator shaft and machine room areas

.

Step

Action

Note

1

Measure the distances between the car 
wall and the elevator shaft wall.
If the gap is less than 300 mm the 
balustrade is not needed.

NOTE!For hydraulic elevators, prevent 

upwards movement before working 
on car roof by disconnecting the up 
direction solenoid.

2

If the gap is 100 mm to 299 mm, fix the 
kick plate.

3

If the gap is 300 mm to 850 mm, use at 
least 0.7 m high balustrade.

4

If the gap is larger than 850 mm, use a 
1.1 m high balustrade. 
If the clearance between the balustrade 
top bar and the lowest obstruction in 
the headroom when the counterweight 
is on the buffer or when the cylinder is 
fully extended (hydraulic elevators) 
would be less than 300 mm, 
temporarily increase the height of 
counterweight buffer or use props.

5

If the landing doors have been 
removed, the gap on the landing side 
may exceed 300 mm. 
In that case, install an extra detachable 
handrail (provided locally) to the 
balustrade on the landing side. 
Refer to site survey if available.

6

If it is not possible to use a balustrade, 
fall arrest equipment must be available.

1039883.wmf

1065938.wmf

Содержание ReSolve 200

Страница 1: ...tion 1 258 AM 10 65 001 D 2013 04 17 2009 KONE Corporation All rights reserved KONE ReSolve 200 AM 10 65 001 2009 KONE Corporation All rights reserved D 2013 04 17 KONE RESOLVE 200 SINGLE FLEXIBLE MAN...

Страница 2: ...product design specifications and procedures reflected in this document NO STATEMENT CONTAINED IN THIS DOCUMENT IS TO BE CONSTRUED AS A WARRANTY OR CONDITION EXPRESS OR IMPLIED AS TO ANY PRODUCT SPEC...

Страница 3: ...OOLS 19 Site requirements 19 Tools 20 Ride comfort measurements 22 1 RECEIPT AND CONTROL OF MATERIAL 23 1 1 Checking of packages 24 1 2 Transporting materials 24 1 3 Unloading materials 27 2 PREPARATI...

Страница 4: ...ing of wiring between controller panel and machinery 64 6 4 Snelis devices 64 6 5 Specific routing for V3 F motor supply cable 65 6 6 Connecting the extension tool 66 6 7 Connecting travelling cable 6...

Страница 5: ...ING DOORS LOCKS AND BUTTONS 131 12 1 Positioning of the car 132 12 2 Connection of landing door lock serial 133 12 3 Wiring of landing call buttons serial 135 12 4 Connection of landing door lock para...

Страница 6: ...ion door CED 209 15 FULL SPEED ADJUSTMENT COMMISSIONING SAFETY INSPECTIONS 210 15 1 Balancing 211 15 2 Selecting roll call type 212 15 3 Selecting LWD type 212 15 4 Shaft setup 213 15 5 Connecting FRD...

Страница 7: ...HANDOVER TO MAINTENANCE 242 17 1 Prerequisites 242 17 2 Handover form 242 17 3 Autocontrol form 244 17 4 Ride comfort 244 17 5 Installation quality checks 244 18 APPROVALS AND VERSION HISTORY 249 APPE...

Страница 8: ...rt cuts of the method Do the installation in the same order as described in the instruction that you get for each job Validity This instruction is valid for installations of elevators with KCE electri...

Страница 9: ...ted documents For more information see AM 01 03 001 Take 5 Electrical safety when working on elevators AM 01 03 010 Safe working in elevator shaft and machine room areas AM 01 01 085 Planning guide an...

Страница 10: ...ter s 1 Receipt and control of material two fitters for transportation of new material 2 Preparations OR 3 Installing travelling cables 4 Dismantling old machine room equipment 5 Installing and wiring...

Страница 11: ...her means Serious injury or death may still be sustained after a fall wearing a harness in an enclosed space AM 01 03 002 Take 5 Electrical safety when working on elevators AM 01 03 003 Take 2 Double...

Страница 12: ...effective grounding to prevent shock to personnel and to ensure that protective fuses operate particularly where protection is provided using residual current device RCD When using a portable electri...

Страница 13: ...en unoccupied by authorised personnel Cover any unused holes in the machine room floor with steel plates Install temporary screens in common elevator shafts and machine rooms where adjacent elevators...

Страница 14: ...it the minus of 24Vdc circuit shall be connected protective earth PE Connection to protective earth is made with connection of KCECPU PE terminal to control panel PE The minus of 24Vdc circuit shall n...

Страница 15: ...injury or death during a fall Requirements Always use the harness attached to an approved fixing point when there is a risk of falling and you are working 1 8 m or more above a lower level Refer to AM...

Страница 16: ...to the public at all times Keep the area outside the working area clean Store materials in designated storage areas Not on landings or in working area In residential buildings keep to the agreed dail...

Страница 17: ...cal safety regulations must be considered Dimensions and rules in this instruction fulfil requirements set in EN 81 1 If local requirements are at a higher level than described in this chapter then th...

Страница 18: ...s 100 mm to 299 mm fix the kick plate 3 If the gap is 300 mm to 850 mm use at least 0 7 m high balustrade 4 If the gap is larger than 850 mm use a 1 1 m high balustrade If the clearance between the ba...

Страница 19: ...must be planned Transportation routes transportation loadings and lifting point loadings must be planned Suitable secure material storage areas must be agreed with building owner adjacent to the eleva...

Страница 20: ...tance meter Handheld tachometer Electric drill Portable crane Extension tool KM796238G10050 for landing doors Pull rope minimum length Elevator shaft height 5 m KONE MiniConsole NOTE These tools can b...

Отзывы: