Kone ReSolve 200 Скачать руководство пользователя страница 15

KONE ReSolve 200

Installation Instruction

15 (258)

AM-10.65.001

(D) 2013-04-17

© 2009 KONE Corporation

All rights reserved.

Personal protective equipment

Safety gloves, safety footwear, safety helmets, eye protection, dust masks, hearing protection 
and fall protection equipment are supplied for your personal protection. USE THEM AS 
REQUIRED.

Special precautions to limit injury in the event of a fall

Safety item

Safety harnesses and associated equipment. Refer to 

AM-01.03.001

.

Dust mask, suitable for working with mineral wool insulation in landing doors.
First aid kit.
Eye protection.
Safety gloves.
Rubber gloves for protection when cleaning rails.
Hearing protection.
Safety helmet.
Work clothes / overalls.
Safety footwear with ankle protection.

WARNING

If the safety harness and its associated 
equipment are not used correctly you may still 
sustain severe injury or death during a fall.

Requirements

Always use the harness attached to an approved fixing point when there is a risk of falling 
and you are working 1.8 m or more above a lower level. 

Refer to AM-01.03.001.

It is recommended that you attach the harness to a fixing point at least 2.0 m above the 
working height.
Where this is not possible keep the lanyard AS SHORT AS POSSIBLE to minimize your 
free fall. (Be aware of the effect of rope and harness stretch when estimating the likely drop 
area and consider the risk from possibly dangerous striking points like guide rail brackets.)
If you are likely to fall down the side of the car you must try to minimize the free fall 
distance to 300 mm or less.
If you have attached the harness to a guide rail bracket or other fixed point in the elevator 
shaft you must ensure that there can not be any unwanted movement of the working 
platform.

When your safety harness is not secured to a life line or other approved fixing point, ensure 
that the lanyard does not cause a catching or tripping hazard.

Содержание ReSolve 200

Страница 1: ...tion 1 258 AM 10 65 001 D 2013 04 17 2009 KONE Corporation All rights reserved KONE ReSolve 200 AM 10 65 001 2009 KONE Corporation All rights reserved D 2013 04 17 KONE RESOLVE 200 SINGLE FLEXIBLE MAN...

Страница 2: ...product design specifications and procedures reflected in this document NO STATEMENT CONTAINED IN THIS DOCUMENT IS TO BE CONSTRUED AS A WARRANTY OR CONDITION EXPRESS OR IMPLIED AS TO ANY PRODUCT SPEC...

Страница 3: ...OOLS 19 Site requirements 19 Tools 20 Ride comfort measurements 22 1 RECEIPT AND CONTROL OF MATERIAL 23 1 1 Checking of packages 24 1 2 Transporting materials 24 1 3 Unloading materials 27 2 PREPARATI...

Страница 4: ...ing of wiring between controller panel and machinery 64 6 4 Snelis devices 64 6 5 Specific routing for V3 F motor supply cable 65 6 6 Connecting the extension tool 66 6 7 Connecting travelling cable 6...

Страница 5: ...ING DOORS LOCKS AND BUTTONS 131 12 1 Positioning of the car 132 12 2 Connection of landing door lock serial 133 12 3 Wiring of landing call buttons serial 135 12 4 Connection of landing door lock para...

Страница 6: ...ion door CED 209 15 FULL SPEED ADJUSTMENT COMMISSIONING SAFETY INSPECTIONS 210 15 1 Balancing 211 15 2 Selecting roll call type 212 15 3 Selecting LWD type 212 15 4 Shaft setup 213 15 5 Connecting FRD...

Страница 7: ...HANDOVER TO MAINTENANCE 242 17 1 Prerequisites 242 17 2 Handover form 242 17 3 Autocontrol form 244 17 4 Ride comfort 244 17 5 Installation quality checks 244 18 APPROVALS AND VERSION HISTORY 249 APPE...

Страница 8: ...rt cuts of the method Do the installation in the same order as described in the instruction that you get for each job Validity This instruction is valid for installations of elevators with KCE electri...

Страница 9: ...ted documents For more information see AM 01 03 001 Take 5 Electrical safety when working on elevators AM 01 03 010 Safe working in elevator shaft and machine room areas AM 01 01 085 Planning guide an...

Страница 10: ...ter s 1 Receipt and control of material two fitters for transportation of new material 2 Preparations OR 3 Installing travelling cables 4 Dismantling old machine room equipment 5 Installing and wiring...

Страница 11: ...her means Serious injury or death may still be sustained after a fall wearing a harness in an enclosed space AM 01 03 002 Take 5 Electrical safety when working on elevators AM 01 03 003 Take 2 Double...

Страница 12: ...effective grounding to prevent shock to personnel and to ensure that protective fuses operate particularly where protection is provided using residual current device RCD When using a portable electri...

Страница 13: ...en unoccupied by authorised personnel Cover any unused holes in the machine room floor with steel plates Install temporary screens in common elevator shafts and machine rooms where adjacent elevators...

Страница 14: ...it the minus of 24Vdc circuit shall be connected protective earth PE Connection to protective earth is made with connection of KCECPU PE terminal to control panel PE The minus of 24Vdc circuit shall n...

Страница 15: ...injury or death during a fall Requirements Always use the harness attached to an approved fixing point when there is a risk of falling and you are working 1 8 m or more above a lower level Refer to AM...

Страница 16: ...to the public at all times Keep the area outside the working area clean Store materials in designated storage areas Not on landings or in working area In residential buildings keep to the agreed dail...

Страница 17: ...cal safety regulations must be considered Dimensions and rules in this instruction fulfil requirements set in EN 81 1 If local requirements are at a higher level than described in this chapter then th...

Страница 18: ...s 100 mm to 299 mm fix the kick plate 3 If the gap is 300 mm to 850 mm use at least 0 7 m high balustrade 4 If the gap is larger than 850 mm use a 1 1 m high balustrade If the clearance between the ba...

Страница 19: ...must be planned Transportation routes transportation loadings and lifting point loadings must be planned Suitable secure material storage areas must be agreed with building owner adjacent to the eleva...

Страница 20: ...tance meter Handheld tachometer Electric drill Portable crane Extension tool KM796238G10050 for landing doors Pull rope minimum length Elevator shaft height 5 m KONE MiniConsole NOTE These tools can b...

Отзывы: