
MAINTENANCE
SERVICE PROCEDURE
PW160-7H VEAM390100
273
EVERY 100 HOURS SERVICE
Maintenance every 50 hours should be carried out at the
same time.
LUBRICATING
The minimum greasing interval is 100 hours, however more fre-
quent greasing will be required depending on conditions/environ-
ment.
1.
Set the work equipment in the greasing posture below, then
lower the work equipment to the ground and stop the engine.
2.
Using a grease pump, pump in grease through the grease fit-
tings shown by arrows.
3.
After greasing, wipe off any old grease that was pushed out.
Содержание PW160-7H
Страница 2: ......
Страница 3: ...PW160 7H VEAM390100 3 FOREWORD ...
Страница 12: ...LOCATIONS OF PLATES TABLE TO ENTER SERIAL NO AND DISTRIBUTOR FOREWORD 12 PW160 7H VEAM390100 ...
Страница 18: ...18 PW160 7H VEAM390100 ...
Страница 220: ...TROUBLESHOOTING OPERATION 220 PW160 7H VEAM390100 ...
Страница 305: ...PW160 7H VEAM390100 305 SPECIFICATIONS ...
Страница 307: ...SPECIFICATIONS SPECIFICATIONS PW160 7H VEAM390100 307 1 PIECE BOOM ...
Страница 308: ...SPECIFICATIONS SPECIFICATIONS 308 PW160 7H VEAM390100 2 PIECE BOOM ...
Страница 345: ......
Страница 346: ...PW160 7H WHEELED EXCAVATOR Form No VEAM390100 2006 Komatsu Hanomag GmbH All Rights Reserved Printed in Germany 03 06 ...