
OPERATIONS AND CHECKS BEFORE STARTING ENGINE
OPERATION
162
PW160-7H VEAM390100
2.
Lower the safety lock lever to the UNLOCK position, switch
OFF the control lever lock switch and raise the bucket from
the ground.
3.
Operate bucket control - right control lever, and arm control -
left control lever (slowly to move the bucket cylinder and arm
cylinder to the end of the stroke.
4.
Carry out bucket and arm operation for 5 minutes at full
stroke, alternating between bucket operation and arm opera-
tion at 30 second intervals.
If the swing lock switch (12) is set to the ON (actuated) posi-
tion and swing control lever is operated at full stroke, oil tem-
perature rise can be increased quicker.
NOTICE
When the work equipment is retracted, take care that it
does not interfere with the machine body or ground.
LOCK
UNLOCK
Control
lever
lock switch
B
A
D
C
(A) Arm Out
(C) Bucket Curl
(B) Arm In
(D) Bucket Dump
A
B
12
Left
control
lever
A
Left swing
B
Right swing
Содержание PW160-7H
Страница 2: ......
Страница 3: ...PW160 7H VEAM390100 3 FOREWORD ...
Страница 12: ...LOCATIONS OF PLATES TABLE TO ENTER SERIAL NO AND DISTRIBUTOR FOREWORD 12 PW160 7H VEAM390100 ...
Страница 18: ...18 PW160 7H VEAM390100 ...
Страница 220: ...TROUBLESHOOTING OPERATION 220 PW160 7H VEAM390100 ...
Страница 305: ...PW160 7H VEAM390100 305 SPECIFICATIONS ...
Страница 307: ...SPECIFICATIONS SPECIFICATIONS PW160 7H VEAM390100 307 1 PIECE BOOM ...
Страница 308: ...SPECIFICATIONS SPECIFICATIONS 308 PW160 7H VEAM390100 2 PIECE BOOM ...
Страница 345: ......
Страница 346: ...PW160 7H WHEELED EXCAVATOR Form No VEAM390100 2006 Komatsu Hanomag GmbH All Rights Reserved Printed in Germany 03 06 ...