MAINTENANCE PROCEDURES
MAINTENANCE
4-62
MAINTENANCE EVERY 1500 HOURS OF OPERATION
4
Carry out these operations together with those to be performed every 500 HOURS.
FUEL INJECTION SYSTEM CHECK AND CLEANING
4
To obtain the best engine performance, the fuel injection valves must operate perfectly. Then, it is necessary to
carry out the fuel injection valves check and cleaning. Given that special tools are needed for these operations, it
is advisable to commission your Komatsu distributor to perform them.
ENGINE CASING BREATHER PIPE CHECK
4
To ensure that emissions will be within the limits allowed by the regulations in force during the engine working life,
the engine casing breather pipe must operate perfectly. Check that the diaphragm is not damaged and the spring
is not broken. Given that special tools are needed for these operations, it is advisable to commission your
Komatsu distributor to perform them.
WEAM014500
Содержание PC22MR-3
Страница 2: ......
Страница 3: ...FOREWORD 11 WEAM014500...
Страница 5: ...FOREWORD FOREWORD 1 3 Storage location for the Operation and Maintenance Manual WEAM014500...
Страница 39: ...SAFETY SAFETY LABELS 2 11 Hydraulic oil filter Electrical outlet Anchorage point Lifting point WEAM014500...
Страница 40: ...SAFETY LABELS SAFETY 2 12 Anchorage point Lifting point Emergency exit Cab specification 09960 01201 WEAM014500...
Страница 88: ...SAFETY MAINTENANCE INFORMATION SAFETY 2 60 WEAM014500...
Страница 208: ...TROUBLESHOOTING FUNCTIONING 3 120 WEAM014500...
Страница 226: ...LUBRICATION MAINTENANCE 4 18 BALL BEARING RING GREASING POINTS 4 Grease WEAM014500...
Страница 281: ...SPECIFICATIONS 15 WEAM014500...
Страница 290: ...LIFTING CAPACITIES SPECIFICATIONS 5 10 WEAM014500...
Страница 310: ...BUCKET WITH HOOK OPTIONAL EQUIPMENT 6 20 WEAM014500...
Страница 311: ......
Страница 312: ...2011 KOMATSU UTILITY EUROPE S p A All Rights Reserved Printed in Europe 02 2011...