
MAINTENANCE PROCEDURE
195
(1) Bucket - Link connecting pins (1 place)
(2) Arm - Bucket connection pin (1 place)
(3) Arm - Link coupling pin (1 place)
(4) Bucket cylinder rod end (1 place)
(5) Link coupling pin (1 place)
(6) Blade cylinder foot pin (1 place)
(7) Blade cylinder rod end (1 place)
(8) Blade foot pin (2 places)
(9) Boom swing bracket pin (2 places)
(10) Boom swing cylinder rod end pin (1 place)
(11) Boom foot pin (2 places)
(12) Boom cylinder foot pin (1 place)
(13) Boom cylinder rod end (1 place)
(14) Arm cylinder foot pin (1 place)
(15) Arm cylinder rod end (1 place)
(16) Boom - Arm connecting pins (1 place)
(17) Bucket cylinder foot pin (1 place)
Содержание 15001
Страница 2: ......
Страница 18: ...16 PAGE INTENTIONALLY LEFT BLANK ...
Страница 19: ...SAFETY AND ACCIDENT PREVENTION 17 ...
Страница 54: ...52 PAGE INTENTIONALLY LEFT BLANK ...
Страница 55: ...THE MACHINE AND ITS OPERATIONS 53 ...
Страница 156: ...154 PAGE INTENTIONALLY LEFT BLANK ...
Страница 157: ...MAINTENANCE 155 ...
Страница 207: ...TECHNICAL SPECIFICATIONS 205 ...
Страница 216: ...LIFTING CAPACITIES 214 PAGE INTENTIONALLY LEFT BLANK ...
Страница 217: ...AUTHORISED OPTIONAL EQUIPMENT 215 ...
Страница 232: ...230 PAGE INTENTIONALLY LEFT BLANK ...
Страница 233: ......
Страница 234: ... 2005 KOMATSU UTILITY EUROPE S p A All Rights Reserved Printed in Europe ...