MAINTENANCE PROCEDURE
190
2.
Loosen plug (1) gradually to release the grease.
3.
When loosening plug (1), turn it a maximum of one turn.
4.
Fit the steel pipes inside the rubber shoe, rotate the
sprocket in reverse, so that the steel pipes make the rub-
ber shoe come up from the idler, then to the side to re-
move.
RUBBER SHOES INSTALLATION
1.
Raise the chassis with the boom and arm.
When doing this, operate the levers slowly.
2.
Mesh the rubber shoe with the sprocket and fit it over the
idler.
3.
Rotate the sprocket in reverse, then push in the rubber
shoe and stop the rotation.
4.
Fit a steel pipe in the rubber shoe, then rotate the sprock-
et again and fit the rubber shoe securely on the idler.
Содержание 15001
Страница 2: ......
Страница 18: ...16 PAGE INTENTIONALLY LEFT BLANK ...
Страница 19: ...SAFETY AND ACCIDENT PREVENTION 17 ...
Страница 54: ...52 PAGE INTENTIONALLY LEFT BLANK ...
Страница 55: ...THE MACHINE AND ITS OPERATIONS 53 ...
Страница 156: ...154 PAGE INTENTIONALLY LEFT BLANK ...
Страница 157: ...MAINTENANCE 155 ...
Страница 207: ...TECHNICAL SPECIFICATIONS 205 ...
Страница 216: ...LIFTING CAPACITIES 214 PAGE INTENTIONALLY LEFT BLANK ...
Страница 217: ...AUTHORISED OPTIONAL EQUIPMENT 215 ...
Страница 232: ...230 PAGE INTENTIONALLY LEFT BLANK ...
Страница 233: ......
Страница 234: ... 2005 KOMATSU UTILITY EUROPE S p A All Rights Reserved Printed in Europe ...