background image

 

-4- 

Fig. 5 

Direction of the cord clip

 

For 110 V

 

For 120 V, 230 V, and 240 V

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

Fig. 4 

Connect to the Brush Holder

 [42]<42>

Connect to the Pushing Button Switch

 [43]<43>

Connect to the Pushing Button Switch 

[43]<43>

Connect to the Brush Holder

 [42]<42>

Содержание G 12SE3

Страница 1: ...f lubricant 7 Tightening torque 7 Checking after reassembly 7 Insulation test 7 No load current value 8 Wiring diagram 8 STANDARD REPAIR TIME UNIT SCHEDULES 9 CONTENTS Page G PRODUCT NAME Disc Grinder...

Страница 2: ...es of the Stator 30 30 from the Pushing Button Switch 43 43 and Brush Holders 42 42 6 Remove the Fan Guide 29 29 and Stator 30 30 from the Housing 36 36 NOTE If the Stator 30 30 is hard to be removed...

Страница 3: ...07720 described below is utilized Place the assembly on a sleeve that matches the dimension of the Packing Gland 6 6 and press down on the top of the Spindle 12 12 with a hand press to remove the gear...

Страница 4: ...re 24 24 See Fig 3 3 When installing the Stator 30 30 into the Housing 36 36 insert it while being careful about correctly placing the internal wires of the Stator 30 30 as shown in Fig 4 Connect the...

Страница 5: ...on of the cord clip For 110 V For 120 V 230 V and 240 V Fig 4 Connect to the Brush Holder 42 42 Connect to the Pushing Button Switch 43 43 Connect to the Pushing Button Switch 43 43 Connect to the Bru...

Страница 6: ...tions a Put the Spring 53 53 on the Off Lock Lever 54 54 and insert the Pin 52 52 as shown in Fig 7 Use a flat blade screwdriver to push the Pin 52 52 in the groove on the back of the Switch Lever 55...

Страница 7: ...44 Before mounting Tail Cover A 47 47 and Tail Cover B 44 44 check the pigtail position Mount the Ferrite Core 57 57 as shown in Fig 10 8 Tighten three of the four Seal Lock Screws W Sp Washer M4 x 1...

Страница 8: ...r mounting the Off Lock Lever 54 54 and On Lock Lever 51 51 Check that the Off Lock Lever 54 54 moves smoothly between the lock position and the unlock position Release the Switch Lever 55 55 and chec...

Страница 9: ...for 30 minutes the no load current values should be as follows Voltage 110 V 120 V 230 V 240 V Current max 5 0 A 5 0 A 2 5 A 2 5 A No load current value Stator 30 30 Pushing Button Switch 43 43 Noise...

Страница 10: ...629VV Retaining Ring for D26 Hole Lock Pin Pushing Button Diffuser Armature Dust Seal Ball Bearing 698SS Special Nut M7 Pinion Gear and Pinion Set Packing Gland Spindle Felt Packing Fringer Gear Gear...

Страница 11: ...1 G13SE3 A A 1 2 3 4 5 6 7 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 29 30 31 32 33 25 26 27 28 34 35 36 37 38 39 40 42 42 41 41 43 44 46 48 47 49 50 52 51 54 55 56 58 59 60 45 39 53 57 34 50...

Страница 12: ...D4 1 29 336530 FAN GUIDE 1 30 341071F STATOR 230 V 240 V 1 30 341071C STATOR 110 V 1 30 341071D STATOR 120 V 1 31 336536 DUST SEAL 1 32 336871 BALL BEARING 698SS 1 33 309929 RUBBER BUSHING 1 34 303694...

Страница 13: ...INAL 2 57 334379 FERRITE CORE 1 58 937631 CORD CLIP 1 59 305720 TAPPING SCREW W FLANGE D4 X 12 1 60 953327 CORD ARMOR D8 8 1 STANDARD ACCESSORIES 501 938332Z WRENCH 1 502 994322 SIDE HANDLE 1 502 3368...

Отзывы: