FUTURE® S AIR HANDLING UNIT
OPERATION AND MAINTENANCE
INSTRUCTIONS
15 December 2020
Ver 1.7 (We reserve the right to changes without prior notice)
14
2.4 Commissioning general instructions
(Figure shows – S500 Counterflow unit, Handedness – Left)
Before commissioning the ventilation unit, make sure that the unit has been installed and cleaned according
to the instructions, that the components and safety devices essential for the safe operation of the unit have
been installed properly, and that the flow rates have been adjusted.
The commissioning of the ventilation unit and the training of the operating personnel are usually carried out
by the supplier of the air-conditioning plant in question.
Содержание Future S
Страница 2: ......