22
TT-1684 3/16
48. Record the required information on decal
GM70205 (see Figure 56). See Figure 6 or the
Parts Lists for the current sensing kit number. See
Figure 59 for the wiring diagram number.
49. Verify that the surface is clean and dry, and place
decal GM70205 on the mounting plate as shown in
Figure 57.
GM70205
Figure 56
Decal GM70205
Note:
This photo does not show the latest controller design.
See Figure 25.
Figure 57
Decal GM70205 Location
Accessories
50. If optional accessory modules are used, attach the
accessory mounting kit to the conversion kit
mounting plate (GM77130). See Figure 22. Then
refer to instruction sheet TT-1449, provided with
the accessory mounting kit, to install and connect
the modules.
51. For installation of other optional accessories, refer
to the instructions provided with the accessory kit
or see the Decision-Maker
r
MPAC 1500 Operation
Manual, TP-6883.
Setup and Test
52. Reconnect power to the transfer switch.
53. Check that the generator set master switch is in the
OFF position.
54. Reconnect the generator set engine starting
battery, negative (--) lead last.
55. Reconnect power to the battery charger, if
equipped.
56. On the MPAC 1500 controller , program the system
parameters shown in Figure 58. Refer to the
transfer switch nameplate for the ATS ratings.
Assign programmable input 1 to Bypass
Contactor Disable.
Also check time delays and
other settings that affect the ATS operation. See
TP-6883, Operation Manual, for instructions.
System Parameter
Factory Setting
Standard or programmed transition
Set these parameters
to match the transfer
switch
[
Single/three phase
Operating voltage
Operating frequency (50 or 60 Hz)
Rated current
Phase rotation
ABC
Commit to transfer (yes or no)
No
Operating mode:
Generator-to-Generator,
Utility-to-Generator, or
Utility-to-Utility
Utility-to-Generator
In-phase monitor
Disabled
In-phase monitor transfer angle
5
_
[
See the ATS nameplate.
Figure 58
System Parameters
57. Run the operation tests outlined in Operation
Manual TP-6883 to verify system operation.
58. Keep these installation instructions and wiring
diagrams with the transfer switch documentation
for future reference.
Содержание ZCB-6
Страница 9: ...TT 1684 3 16 9 Figure 22 Conversion Kit Assembly...
Страница 14: ...14 TT 1684 3 16 GM77826 Figure 37 Conversion Kit Harness GM77826 for Model ZCB 6...
Страница 21: ...TT 1684 3 16 21 Figure 55 Current Sensing Kit Wiring Diagram GM47803...
Страница 25: ...TT 1684 3 16 25 Schematic Model ZCM 6 Programmed Transition with MPAC 1500 Controls 150 400 Amps GM99379...
Страница 28: ...TT 1684 3 16 28 Schematic Model ZCB 6 Programmed Transition with MPAC 1500 Controls 600 3000 Amps GM99381...
Страница 31: ...TT 1684 3 16 31 Schematic Diagram Model ZCB 6 Programmed Transition w MPAC 1500 Controls 150 400 Amps GM99383...
Страница 34: ...TT 1684 3 16 34 This page intentionally left blank...